[1]郑 维,陈明浩,陈兴海.四川盆地某车站路基上拱原因分析及变形趋势预测[J].高速铁路技术,2025,(02):46-50,56.[doi:10.12098/j.issn.1674-8247.2025.02.007]
 ZHENG Wei CHEN Minghao CHEN Xinghai.Cause Analysis and Deformation Trend Prediction of Subgrade Upwarp of a Railway Station in Sichuan Basin[J].HIGH SPEED RAILWAY TECHNOLOGY,2025,(02):46-50,56.[doi:10.12098/j.issn.1674-8247.2025.02.007]
点击复制

四川盆地某车站路基上拱原因分析及变形趋势预测()
分享到:

《高速铁路技术》[ISSN:1674-8247/CN:51-1730/U]

卷:
期数:
2025年02期
页码:
46-50,56
栏目:
理论探索
出版日期:
2025-04-20

文章信息/Info

Title:
Cause Analysis and Deformation Trend Prediction of Subgrade Upwarp of a Railway Station in Sichuan Basin
文章编号:
1674-8247(2025)02-0046-05
作者:
郑 维 陈明浩 陈兴海
(中铁二院工程集团有限责任公司, 成都 610031)
Author(s):
ZHENG Wei CHEN Minghao CHEN Xinghai
(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China)
关键词:
四川盆地 无砟轨道 路基上拱 变形趋势预测
Keywords:
Sichuan Basin ballastless track subgrade upwarp deformation trend prediction
分类号:
U216.41; U213.1
DOI:
10.12098/j.issn.1674-8247.2025.02.007
文献标志码:
A
摘要:
四川盆地红层区高速铁路路基上拱变形已成为高速铁路建设面临的难题。以四川盆地某客运专线铁路车站上拱路基为研究对象,在既有研究成果的基础上,通过地质调绘、地质钻探、地应力测试、室内试验等方法,分析车站路基上拱的原因,并对典型变形段上拱变形趋势进行预测。结果表明,(1)车站路基持续上拱的内因为红层泥岩在低应力作用下的蠕变性,外因为场地内存在的水平构造应力;(2)预测车站典型变形段(K 53+073~K 53+293)持续变形至2041年趋于稳定,最终上拱变形量为41 mm,目前已累计上拱24.8 mm,剩余变形量约为16 mm。研究成果可为车站路基上拱病害整治工程设计提供依据。
Abstract:
The upwarp deformation of subgrade of high-speed railway in red layer area of Sichuan Basin has emerged as a challenge in high-speed railway construction. Taking the subgrade upwarp of a passenger dedicated railway station in Sichuan Basin as the research object, based on the existing research results, the causes of subgrade upwarp of the station were analyzed by means of geological mapping, geological drilling, in-situ stress test and indoor test. On this basis, the upwarptrend of typical deformation section was predicted. The results show that:(1)The internal cause of the continuous upwarping of the station subgrade is the creep of red mudstone under low stress, while the external cause is the horizontal tectonic stress in the site.(2)It is predicted that the typical deformation section(K 53+073~K 53+293)of the station will be stable until 2041, with a final upwarp deformation of 41 mm,the cumulative upwarp now is 24.8 mm, and the remaining deformation is about 16 mm. The research findings can provide a basis for the design of the upwarp disease treatment project of the station.

参考文献/References:

[1] 丁小刚, 马丽娜, 张戎令, 等. 高速铁路弱膨胀泥岩地基轨道上拱量计算预测[J]. 兰州大学学报(自然科学版), 2021, 57(6): 753-759.
DING Xiaogang, MA Lina, ZHANG Rongling, et al. Expansion Potential of Mudstones with a Low Clay Mineral Content on a High-speed Ballastless Railway[J]. Journal of Lanzhou University(Natural Sciences), 2021, 57(6): 753-759.
[2] 杨吉新, 马旭超, 刘前瑞. 关于成渝高铁路基上拱问题的探讨[J]. 铁道建筑, 2016, 56(8): 112-115.
YANG Jixin, MA Xuchao, LIU Qianrui. Exploring on Subgrade Swelling of Chengdu-Chongqing High Speed Railway[J]. Railway Engineering, 2016, 56(8): 112-115.
[3] 张国胜, 刘更新, 贾华强. 郑西高铁K921段无砟轨道上拱整治方案研究[J]. 中国铁路, 2013(7): 52-54.
ZHANG Guosheng, LIU Gengxin, JIA Huaqiang. Study on Treatment Scheme of Upper Arch of Ballastless Track in K921 Section of Zhengzhou-Xi'an High-speed Railway[J]. Chinese Railways, 2013(7): 52-54.
[4] 陈伟志. 低矮路堤荷载下膨胀土地基胀缩变形特性研究[D]. 成都: 西南交通大学, 2015.
CHEN Weizhi. Study on Deformation Characteristics of Expansive Soil Foundation under Low Embankment Load[D]. Chengdu: Southwest Jiaotong University, 2015.
[5] DUAN Junyi, YANG Guolin, HU Min, et al. Heave Performance of a Ballastless Track Subgrade of Double Line High-speed Railway Filled with Micro-expansive Andesite under Water Immersion[J]. Construction and Building Materials, 2020, 252: 119087.
[6] 龙清亮. 川南城际铁路自宜线泥岩膨胀特性研究和防治对策[J].高速铁路技术, 2023, 14(3):102-106.
LONG Qingliang. A Study on Swelling Characteristics of Mudstone along Zigong-Yibin Line of South Sichuan Intercity Railway and Countermeasures[J].High Speed Railway Technology, 2023, 14(3):102-106.
[7] 钟志彬, 李安洪, 邓荣贵, 等. 高速铁路红层软岩路基时效上拱变形机制研究[J]. 岩石力学与工程学报, 2020, 39(2): 327-340.
ZHONG Zhibin, LI Anhong, DENG Ronggui, et al. Study on Time-dependent Upheaval Deformation Mechanisms of Red-bed Soft Rock Subgrade of High-speed Railways[J]. Chinese Journal of Rock Mechanics and Engineering, 2020, 39(2): 327-340.
[8] 刘毅, 程谦恭, 陈梦发, 等. 某红层深挖路堑基底上拱离心模型试验研究[J]. 高速铁路技术, 2023, 14(2): 70-74.
LIU Yi, CHENG Qiangong, CHEN Mengfa, et al. An Experimental Study on Centrifugal Model of Upheaving of Deep Cutting Base in the Red Bed[J]. High Speed Railway Technology, 2023, 14(2): 70-74.
[9] 王冲, 王起才, 张戎令, 等. 无砟轨道高速铁路路基上拱病害成因分析[J]. 科学技术与工程, 2017, 17(12): 252-256.
WANG Chong, WANG Qicai, ZHANG Rongling, et al. Analysis of Arch Disease of Ballastless Track High-speed Railway[J]. Science Technology and Engineering, 2017, 17(12): 252-256.
[10] 王剑. 兰新高速铁路路基上拱原因分析及整治措施[J]. 路基工程, 2015(1): 205-209.
WANG Jian. Cause Analysis on Subgrade Arching of Lanzhou-Xinjiang High-speed Railway and the Control Measures[J]. Subgrade Engineering, 2015(1): 205-209.
[11] 吴沛沛. 基于流变的高速铁路深挖路堑长期上拱变形数值分析[J]. 路基工程, 2019(1): 135-139.
WU Peipei. Numerical Analysis on the Long-term Upheaval Deformation of High-speed Railway Deep Cutting Based on Rheology[J]. Subgrade Engineering, 2019(1): 135-139.
[12] TB 10038-2022铁路工程特殊岩土勘察规程 [S].
TB 10038-2022 Code for Special Soil and Rock Investigation of Railway Engineering[S].
[13] 王建奇, 王秉勇, 韩侃. 高速铁路路基上拱变形问题综述及对策[J]. 路基工程, 2024(1): 1-6.
WANG Jianqi, WANG Bingyong, HAN Kan. Overview and Countermeasures of Up-arching Deformation Problem for High-speed Railroad Roadbed[J]. Subgrade Engineering, 2024(1): 1-6.

相似文献/References:

[1]付 娜,王闵文,陈 果,等.高速铁路无砟轨道振动相关问题及频域研究方法综述[J].高速铁路技术,2024,15(05):30.[doi:10.12098/j.issn.1674-8247.2024.05.005]
 FU Na,WANG Minwen,CHEN Guo,et al.Review on Problems related to Vibration Effects of Ballastless Track and Analyzing Method in Frequency Domain[J].HIGH SPEED RAILWAY TECHNOLOGY,2024,15(02):30.[doi:10.12098/j.issn.1674-8247.2024.05.005]
[2]陈志远,华正兴.高速铁路无砟轨道扣件自动化安装车研究[J].高速铁路技术,2024,15(05):119.[doi:10.12098/j.issn.1674-8247.2024.05.020]
 CHEN Zhiyuan,HUA Zhengxing.Study on Automated Installation Vehicle for Fastener Systems in Ballastless High-speed Railway Tracks[J].HIGH SPEED RAILWAY TECHNOLOGY,2024,15(02):119.[doi:10.12098/j.issn.1674-8247.2024.05.020]
[3]余雷,陈文东,王亚威,等.箱式路基差异沉降对无砟轨道静力行为影响[J].高速铁路技术,2025,(01):1.[doi:10.12098/j.issn.1674-8247.2025.01.001]
 YU Lei CHEN Wendong WANG Yawei WANG Xiang.Impact of Differential Settlement of Box-type Subgrade on Static Mechanical Behavior of Ballastless Track[J].HIGH SPEED RAILWAY TECHNOLOGY,2025,(02):1.[doi:10.12098/j.issn.1674-8247.2025.01.001]
[4]王瑶,和振兴.轨道板侧裂纹对车辆-轨道动力性能的影响研究[J].高速铁路技术,2025,(01):55.[doi:10.12098/j.issn.1674-8247.2025.01.009]
 WANG Yao HE Zhenxing.Study on the Influence of Side Cracks in Track Slabs on Vehicle-track Dynamic Performance[J].HIGH SPEED RAILWAY TECHNOLOGY,2025,(02):55.[doi:10.12098/j.issn.1674-8247.2025.01.009]

备注/Memo

备注/Memo:
收稿日期:2024-06-12
作者简介:郑维(1989-),男,工程师。
基金项目:中国国家铁路集团有限公司重大课题(K2019G045)
更新日期/Last Update: 2025-04-20