参考文献/References:
[1] 李阳春.武汉至咸宁城际铁路CRTSⅢ型板式无砟轨道技术[J].铁道工程学报,2013,30(4):51-55.
LI Yangchun. CRTSⅢ Slab Track Technology Applied in Wuhan to Xianning Intercity Railway[J]. Journal of Railway Engineering Society,2013,30(4):51-55.
[2] 刘延龙.CRTSⅢ型路基纵连轨道板制造技术及创新[J].铁道建筑技术,2010,37(9):83-86.
LIU YanLong.Manufacturing Technology and Innovation of CRTSⅢ Subgrade Vertical Track Plate[J].Railway Construction Technology,2010,37(9):83-86.
[3] 黄众.城际板式无砟轨道结构优化研究[D].成都:西南交通大学,2011.
HUANG Zhong.Study on the Optimization of the Intercity Slab Ballastless Trace Structure[D].Chengdu:Southwest Jiaotong University,2011.
[4] 杨健健,饶国和,许昌,等.测量机器人GeoCom 接口技术的开发与应用[J].水电自动化与大坝监测,2008,32(1):72-74.
YANG Jianjian, RAO Guohe, XU Chang, et al. Development and Application of Georobot GeoCOM Technology[J]. Hydropower Automation and Dam Monitoring, 2008,32(1):72-74.
[5] 许双安.CRTSⅢ型板式无砟轨道施工布板计算模型研究[J].铁道标准设计,2015,59(7):74-78.
XU Shuang’an. Research on the Calculation Model of Plate Layout and Construction for CRTSⅢ Ballastless Track[J].Railway Standard Design,2015,59(7):74-78.
[6] 徐万鹏.基于CP Ⅲ网的板式无砟轨道精调系统[J].铁道工程学报,2011,28(7):53-58.
XU Wanpeng.Fine—adjustment System for Slab Ballastless Track Based on CPⅢ Control Net[J].Journal of Railway Engineering Society,2011,28(7):53-58.
[7] 许双安.CRTSⅢ板式无砟轨道布板设计与定位测量系统设计与实现[J].铁道勘察,2017,43(1):1-5.
XU Shuang’an. Deign and Realization of Layout Design and Position Measurement System for CRTSⅢ Ballastless Track Plate [J]. Railway Investigation and Surveying, 2017,43(1):1-5.
[8] 许双安,任晓春,武瑞宏. CRTSⅡ型无砟轨道板精调系统设计与实现[J]. 高速铁路技术,2014,5(5): 66-69.
XU Shuang’an,REN Xiaochun,WU Ruihong. Design and Realization of Fine-adjustment system for CRTSⅡ Ballastless Track Slab[J]. High Speed Railway Technology,2014,5(5): 66-69.