参考文献/References:
[1] TB 10002.3-2005 铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S].
TB 10002.3-2005 Code for Design of Reinforced Concrete and Prestressed Concrete Structures of Railway Bridges and Culverts [S].
[2] 刘杰.大跨度钢箱梁斜交顶推结构受力特性与施工控制技术研究[D].长沙:长沙理工大学,2006.
LIU Jie. Research on Mechanical Characteristics And Construction Control Technology of Oblique Incremental Launching Structure of Long-Span Steel Box Girder [D]. Changsha: Changsha University of Science and Technology, 2006.
[3] 范立础.桥梁工程[M].北京:人民交通出版社,2001.
FAN Lichu.Bridge Engineering [M]. Beijing: China Communications Press, 2001.
[4] 郝志侃.预应力混凝土连续箱梁顶推施工[J].山西建筑,2004,30(6):68-69.
HAO Zhikan. Incremental Launching Construction of Prestressed Continuous Concrete Box Girder [J]. Shanxi Architecture, 2004, 30(6): 68-69.
[5] 钟启宾.我国连续顶推技术的最新发展概况[J].桥梁建设,1994,24(2):46-48.
ZHONG Qibin. The Latest Development of Continuous Incremental Launching Technology in China [J]. Bridge Construction, 1994, 24(2): 46-48.
[6] 刘建龙.哈尔滨尚志大桥连续钢箱梁顶推设计与施工技术[J].中南公路工程,2005,30(1):110-112.
LIU Jianlong. Trust Design and Construction Techniques of Continuous Steel Box Girder of Haerbin Shangzhi Bridge[J]. Central South Highway Engineering, 2005, 30(1): 110-112.
[7] 王文雷,冯德飞,卢文良.顶推法施工中钢箱梁在滑道处的局部应力分析[J].北京交通大学学报,2006,30(S1):190-193.
WANG Wenlei, FENG Defei, LU Wenliang. Local Stress Analysis of Steel Box Beam Close to Sliding Path by Incremental Launching Method [J]. Journal of Beijing Jiaotong University, 2006, 30(S1): 190-193.
[8] 赵如东.连续梁顶推技术的新发展[J].水运工程,2004,32(3):130-133.
ZHAO Rudong. New Development of Incremental Launching Method for Continuous Beams [J]. Port & Waterway Engineering, 2004, 32(3): 130-133.
[9] 闫波.太平沟大桥曲线箱梁顶推施工设计概述[J].科技情报开发与经济,2004,14(6):276-277.
YAN Bo. On the Curved Box-beam Push Construction of the Taipinggou Bridge [J]. SCI/TECH Information Development & Economy, 2004, 14(6): 276-277.
[10] 蒋田勇,安磊,田仲初,等.斜交连续箱梁顶推施工中落梁仿真分析[J].桥梁建设,2014,44(1):101-106.
JIANG Tianyong, AN lei, TIAN Zhongchu, et al. Simulation Analysis of Jacking-down of Girder In Incremental Launching Construction of Oblique Continuous Box Girder[J]. Bridge Construction, 2014, 44(1): 101-106.