参考文献/References:
[1] 黄松,周书明,闫国栋.浅埋大跨隧道小角度下穿既有线沉降控制技术[J].石家庄铁道大学学报( 自然科学版),2011,24( 3): 50-54.
HUANG Song,ZHOU Shuming,YAN Guodong.Settlement Control of Large-span Tunnel Crossing Under Existing Railway at Small Angle[J]. Journal of Shijiazhuang Tiedao University(Natural Science),2011,24( 3): 50-54.
[2] 马伟平.浅谈顶进桥施工中轨道的加固方法[J].土木建筑,2009,28(11): 119-120.
MA Weiping. Discussion on Reinforcement Method of Track in Construction of Jacking - in Bridge[J].Civil Construction,2009,28(11): 119-120.
[3] 朱正国,李兵兵,李文江,等.新建铁路隧道下穿既有铁路施工引起的地表沉降控制准研究[J].中国铁道科学,2011,32(5):78-82.
ZHU Zhengguo,LI Bingbing,LI Wenjiang,et al. Study on Ground Surface Settlement Control Standard Induced by Construction of New-Built Railway Tunnel Under-Passing Existing Railway[J].China Railway Science,2011,32(5):78-82.
[4] 罗浩威.地铁隧道下穿既有铁路对线路结构的影响研究[D].兰州:兰州交通大学,2013.
LUO Haowei.Analysis in Influences on Railway Structure Caused by Metro Tunnel Undergoing through Existing Lines[D].Lanzhou: Lanzhou Jiaotong University,2013.
[5] 陈星欣,白冰.隧道下穿既有结构物引起的地表沉降控制标准研究[J].工程地质学报,2011,19(1):103-108.
CHEN Xingxin, BAI Bing.Control Standards for Settlement of Ground SurfaceCaused by Tunnel Underneath Passing Existing Structures[J].Journal of Engineering Geology,2011,19(1):103-108.
[6] 赵衍发.浅埋暗挖法下穿既有地铁车站的风险控制[D].北京:北京交通大学,2013.
ZHAOYanfa. Risk Management for a Subway Station with Shallow Tunnelling Method[D].Beijing: Beijing Jiaotong University, 2013.
相似文献/References:
[1]赵柏文.铁路隧道高瓦斯突出段安全施工关键技术[J].高速铁路技术,2017,8(06):38.[doi:10.12098/j.issn.1674-8247.2017.06.009]
ZHAO Baiwen.Key Technologies for Safety Construction of High Gas Outburst Section of Railway Tunnel[J].HIGH SPEED RAILWAY TECHNOLOGY,2017,8(06):38.[doi:10.12098/j.issn.1674-8247.2017.06.009]