[1]高崇华.成贵铁路乐山至贵阳段建设方案研究[J].高速铁路技术,2019,10(03):88-92.[doi:10.12098/j.issn.1674-8247.2019.03.019]
GAO Chonghua.Study on Construction Scheme of Leshan-Guiyang Section of Chengdu-Guizhou Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2019,10(03):88-92.[doi:10.12098/j.issn.1674-8247.2019.03.019]
点击复制
成贵铁路乐山至贵阳段建设方案研究()
《高速铁路技术》[ISSN:1674-8247/CN:51-1730/U]
- 卷:
-
10卷
- 期数:
-
2019年03期
- 页码:
-
88-92
- 栏目:
-
勘察设计
- 出版日期:
-
2019-06-28
文章信息/Info
- Title:
-
Study on Construction Scheme of Leshan-Guiyang Section of Chengdu-Guizhou Railway
- 文章编号:
-
1674—8247(2019)03—0088-05
- 作者:
-
高崇华
-
中铁二院工程集团有限责任公司, 成都 610031
- Author(s):
-
GAO Chonghua
-
China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, China
-
- 关键词:
-
成贵铁路|建设方案|研究
- Keywords:
-
Chengdu-Guiyang railway|construction scheme|study
- 分类号:
-
U213.3
- DOI:
-
10.12098/j.issn.1674-8247.2019.03.019
- 文献标志码:
-
A
- 摘要:
-
成贵通道内客运量需求旺盛,但区域内仍存在一定的货运量,在成贵铁路研究初期,是新建客运专线还是客货混运铁路,争议较大,难以抉择。本文对成贵铁路开展可行性研究工作时面临的通道内客运需求、路网布局、相关通路、工程投资等情况进行回顾分析,重点研究区域内货运量的分流方案,论证成贵铁路按照客运专线标准建设的可行性、必要性。为我国高速铁路网中,客运需求旺盛,但存在货运量的铁路选择建设标准提供研究思路。
- Abstract:
-
There is strong demand for passenger transport in Chengdu-Guiyang corridor, but there is still a certain amount of freight transport in the region. In the early stage of Chengdu-Guiyang Railway research, it is difficult to decide whether to build a new passenger dedicated line or a mixed passenger-freight railway. This paper reviews and analyzes passenger transport demand, railway network layout, related passageway and project investment in Chengdu-Guiyang Railway during feasibility study, focuses on the diversion scheme of freight transport volume in the region and demonstrates the feasibility and necessity of Chengdu-Guiyang Railway construction according to standards for passenger dedicated line. It will provide research ideas for construction standard selection of the railway with freight volume in high-speed railway network in China, where the passenger demand is strong.
备注/Memo
- 备注/Memo:
-
作者简介:高崇华(1973-),女,高级工程师。引文格式:高崇华. 成贵铁路乐山至贵阳段建设方案研究[J]. 高速铁路技术,2019,10(3):88-92.GAO Chonghua. Study on Construction Scheme of Leshan-Guiyang Section of Chengdu-Guizhou Railway[J]. High Speed Railway Technology, 2019, 10(3):88-92.
更新日期/Last Update:
2019-06-28