参考文献/References:
[1] 张庆飞,吕改杰,冯宇凇,等. V型沟谷高填路基沉降变形特征及稳定性分析[J]. 山西建筑,2021,47(22): 1 - 4. ZHANG Qingfei,LV Gaijie,FENG Yusong,et al. Analysis of High Fill Subgrad in V-Shaped Valley for Settlement Deformation and Stability[J]. Shanxi Architecture,2021,47(22): 1 - 4.
[2] 陈强,李凤成,于兴国,等. 基于FLAC3D的V型沟谷高填方路基稳定性分析[J]. 四川建筑,2019,39(6): 133 - 135. CHEN Qiang,LI Fengcheng,YU Xingguo,et al. Stability Analysis of V-shaped Valley High Fill Subgrade Based on FLAC3D[J]. Sichuan Architecture,2019,39(6): 133 - 135.
[3] 张占荣,刘庆辉,杨艳霜,等. 高填土路堤沉降计算方法分析[J].铁道标准设计,2011,55(2): 5 - 8.ZHANG Zhanrong,LIU Qinghui,YANG Yanshuang,et al. Analysis of Settlement Calculation Method for High Fill Embankment[J]. Railway Standard Design,2011,55(2): 5 - 8.
[4] 葛苗苗,李宁,张炜,等. 黄土高填方沉降规律分析及工后沉降反演预测[J]. 岩石力学与工程学报,2017,36(3): 745 - 753. GE Miaomiao,LI Ning,ZHANG Wei,et al. Settlement Behavior and Inverse Prediction of Post-Construction Settlement of High Filled Loess Embankment[J]. Chinese Journal of Rock Mechanics and Engineering,2017,36(3): 745 - 753.
[5] 曹宏伟. 土工格栅在高填路堤中的应用[J]. 科学技术创新, 2022(24): 85 - 88. CAO Hongwei. Application of Geogrid in High Fill Embankment[J]. Scientific and Technological Innovation,2022(24): 85 - 88.
[6] 刘宏,张倬元,韩文喜. 高填方地基土工离心模型试验技术研究[J]. 地质科技情报,2005,24(1): 103 - 106. LIU Hong,ZHANG Zhuoyuan,HAN Wenxi. Centrifugal Model Technique of High Embankment[J]. Geological Science and Technology Information,2005,24(1): 103 - 106.
[7] 贾亮,贺世开,朱彦鹏,等. 高填方路堤工后沉降监测试验研究[J]. 公路交通科技,2017,34(3): 15 - 19. JIA Liang,HE Shikai,ZHU Yanpeng,et al. Experimental Study on Monitoring of Post-Construction Settlement of High-Filled Embankment[J]. Journal of Highway and Transportation Research and Development,2017,34(3): 15 - 19.
[8] 李宁,张海凤,周川滨. 高填路基分层填筑过程非线性有限元分析[J]. 高速铁路技术,2020,11(5): 42 - 45. LI Ning,ZHANG Haifeng,ZHOU Chuanbin. Nonlinear Finite Element Analysis of Layered Filling of High Subgrade[J]. High Speed Railway Technology,2020,11(5): 42 - 45.
[9] ZHANG Yan,WANG Yong. Numerical Simulation Study on Self-Settlement Process of High Embankment[J]. Advanced Materials Research,2013 : 1221 - 1224.
[10]?李占锋. 山区高填路堤沉降特征研究[J]. 公路工程,2019, 44(2): 169 - 172,216. LI Zhanfeng. Study on Settlement Characteristics of High Fill Embankment in Mountain Area[J]. Highway Engineering,2019, 44(2): 169 - 172,216.
[11]?王刚,陈金海,王明星. 用压密注浆法加固高速公路高填方路段路基(堤)[J]. 公路交通科技,2002,19(2): 51 - 52. WANG Gang,CHEN Jinhai,WANG Mingxing. Strengthening the Subgrade (embankment) in the High-fill Section of the Expressway by Compaction Grouting Method[J]. Journal of Highway and Transportation Reseach Andk Development,2002,19(2): 51 - 52.
[12]?白国栋. 东水站软土地基加固的效果及启示[J]. 铁道建筑, 1998,38(2): 15 - 18. BAI Guodong. Effect and Enlightenment of Soft Soil Foundation Reinforcement in Dongshui Station[J]. Railway Engineering, 1998,38(2): 15 - 18.[13]?孙成木. 深层搅拌桩在高填路基加固中的应用[J]. 铁道勘察, 2005,31(2): 55 - 56. SUN Chengmu. Deep Stirring Piles for the Thick Filled Subgrade [J]. Railway Investigation and Surveying,2005,31(2): 55 - 56.
[14]?尹万杰,曾思坡,邰昊. 强夯结合顶层加筋处理高填路基[J]. 城市建筑,2012(17): 274. YIN Wanjie,ZENG Sipo,TAI Hao. Dealing with High Fill Roadbed Dynamic Compaction in Combination with the Top and Muscles[J]. Urbanism and Architecture,2012(17): 274.
[15]?王长丹,陈凯祥,陕耀,等. 深厚软土区有轨电车桩板结构路基沉降变形离心模型试验[J]. 岩石力学与工程学报,2022,41(S2):3444 - 3452. WANG Changdan,CHEN Kaixiang,SHAN Yao,et al. Centrifugal Test on Settlement of Tram Pile Plate Structure Embankment in Deep Soft Area[J]. Chinese Journal of Rock Mechanics and Engineering, 2022,41(S2): 3444 - 3452.
[16]?李安洪,姚裕春. 复杂艰险山区高速铁路路基变形控制技术[J].高速铁路技术,2018,9(S2): 43 - 50. LI Anhong,YAO Yuchun. The Control Technology for Subgrade Deformation of High-Speed Railway in Complex and Dangerous Mountain Area[J]. High Speed Railway Technology,2018,9(S2):43 - 50.
[17]?黄泽浪. 高填路基施工在山区高速公路路基改造工程中的应用[J]. 交通世界,2020(36): 68 - 69. HUANG Zelang. Application of High-fill Subgrade Construction in Expressway Subgrade Reconstruction Project in the Mountainous Area [J]. Transpo World ,2020(36): 68 - 69.
[18]?吴发展,吴飞. 宝坪高速公路高填路基强夯施工技术[J]. 施工技术,2020,49(S1): 1334 - 1337. WU Fazhan,WU Fei. Foundation Treatment Construction Technology of Dynamic Compaction for High Fill Subgrade of Baoping Expressway [J]. Construction Technology,2020,49(S1): 1334 - 1337.
[19]?王远雄. 高速公路高填路基施工中冲击碾压技术的运用[J]. 工程技术研究,2020,5(4): 90 - 91. WANG Yuanxiong. Application of Impact Rolling Technology in the Construction of Expressway High-fill Subgrade[J]. Engineering and Technological Research,2020,5(4): 90 - 91.
[20]?王鹏凯. 路基沉降控制及施工技术研究[J]. 交通世界,2016 (11): 52 - 53. WANG Pengkai. Study on Subgrade Settlement Control and Construction Technology[J]. TranspoWorld ,2016(11): 52 - 53, 81.
[21]?马贵红,吴仕林. 高填路基施工沉降监测与变形控制技术[J].云南水力发电,2021,37(10): 26 - 32. MA Guihong,WU Shilin. Construction Settlement Monitoring and Deformation Control Technology of High Fill Subgrade[J]. Yunnan Water Power,2021,37(10): 26 - 32.
相似文献/References:
[1]李林.基于Copula 函数的青藏铁路多年冻土区路基变形
相关性分析[J].高速铁路技术,2022,13(05):73.[doi:10.12098/j.issn.1674-8247.2022.05.015]
LI Lin.Correlation Analysis of Subgrade Deformation of Qinghai-Tibet
Railway in Permafrost Regions Based on Copula Function[J].HIGH SPEED RAILWAY TECHNOLOGY,2022,13(06):73.[doi:10.12098/j.issn.1674-8247.2022.05.015]
[2]谢先当,张权,付洋.铁路路基BIM设计系统研究[J].高速铁路技术,2024,15(02):71.[doi:10.12098/j.issn.1674-8247.2024.02.013]
XIE Xiandang,ZHANG Quan,FU Yang.Study on BIM Design System for Railway Subgrade[J].HIGH SPEED RAILWAY TECHNOLOGY,2024,15(06):71.[doi:10.12098/j.issn.1674-8247.2024.02.013]