[1]叶 堃,丁浩江,岳志勤.玉京山隧道巨型溶洞地质特征与稳定性评价[J].高速铁路技术,2023,14(01):81-85,90.[doi:10.12098/j.issn.1674-8247.2023.01.015]
 YE Kun,DING Haojiang,YUE Zhiqin.Geological Characteristics and Stability Evaluation of Giant Karst Cave Affecting Yujingshan Tunnel[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(01):81-85,90.[doi:10.12098/j.issn.1674-8247.2023.01.015]
点击复制

玉京山隧道巨型溶洞地质特征与稳定性评价()
分享到:

《高速铁路技术》[ISSN:1674-8247/CN:51-1730/U]

卷:
14卷
期数:
2023年01期
页码:
81-85,90
栏目:
出版日期:
2023-03-10

文章信息/Info

Title:
Geological Characteristics and Stability Evaluation of Giant Karst Cave Affecting Yujingshan Tunnel
文章编号:
1674-8247(2023)01-0081-05
作者:
叶 堃丁浩江岳志勤
中铁二院工程集团有限责任公司,成都610031
Author(s):
YE KunDING HaojiangYUE Zhiqin
China Railway Eryuan Engineering Group Co. ,Ltd. ,Chengdu 610031 ,China
关键词:
隧道工程 巨型溶洞 工程地质特征 分析评价
Keywords:
tunnelinggiant karst cavegeological characteristicsanalysis and evaluation
分类号:
P642.25
DOI:
10.12098/j.issn.1674-8247.2023.01.015
文献标志码:
A
摘要:
成贵高速铁路玉京山隧道施工中遭遇高速铁路建设史上的最大溶洞,溶洞下部发育大型暗河,洞内充填物厚度大,成分复杂,工程地质环境复杂,处理难度大、施工安全危险性高。现场采用地质调查及测绘、三维激光扫描、水文观测、物探、钻探、孔内测试、取样试验等综合勘察手段,查明了巨型溶洞的形态特征、水文地质特征和充填物工程地质特征,对洞壁稳定性进行了分析和评价,预测了洞顶塌落高度及稳定性,提出了“暗河改道、溶洞回填、桥梁跨越”总体处理措施建议,为合理确定施工整治方案提供了详实的地质依据。研究成果可为山区高速铁路岩溶勘察提供重要参考。
Abstract:
During the construction of the Yujingshan Tunnel of Chengdu-Guiyang High-speed Railway,the largest karst cave in the history of high-speed railway construction was encountered,where the geological environment is complicat-ed,with large underground rivers developed underneath and thick filling materials of complex composition inside. The treat-ment is difficult,and the construction safety risk is high. Comprehensive investigation methods including geological survey and mapping,3D laser scanning,hydrological observation,geophysical prospecting,drilling,in-hole testing,and sam-pling tests were applied on-site to find out the morphological characteristics,hydrogeological characteristics,and geological characteristics of fillings in this giant karst cave,analyze and evaluate the stability of cave walls,and predict the collapsed height and stability of the roof. The overall treatment measure of“ diverting underground rivers,backfilling karst cave,and crossing with bridges ”was put forward,which provided a detailed geological basis for reasonably determining the construc-tion treatment scheme. The research results can provide an important reference for investigating the karsts of high-speed rail-ways in mountainous areas.

参考文献/References:

[1]张英骏,缪钟灵,等. 应用岩溶学及洞穴学[M]. 贵阳: 贵州人民出版社,1985. ZHANG Yingjun, MIAO Zhongling,et al. Applied Karst and Caveology [M]. Guizhou: Guizhou People’s Publishing House,1985.
[2]苗德海. 宜万铁路岩溶隧道灾害及防治对策[J]. 铁道标准设计, 2007,51(7): 96 - 99. MIAO Dehai. Karst Tunnel Disasters in Yichang-Wanzhou Railway and Prevention Countermeasures[J]. Railway Standard Design, 2007,51(7): 96 - 99.
[3]毛邦燕,蒋良文,王科,等. 高速铁路穿越大型溶洞风险评估研究[J]. 铁道工程学报,2019,36(2): 21 - 26,32.
[4]铁道部第二勘测设计院. 岩溶工程地质[M]. 北京: 中国铁道出版社,1984. Ministry of Railways No. 2 Survey and Design Institute. Karst Engineering Geology[M]. Beijing: China Railway Publishing House,1984.
[5]薛禹群,朱学愚. 地下水动力学[M]. 北京: 地质出版社,1979.XUE Yuqun,ZHU Xueyu. Groundwater Hydraulics[M]. Beijing:Geological Publishing House,1979.
[6]任美锷,刘振中. 岩溶学概论[M]. 北京: 商务印书馆,1983. REN Meie,LIU Zhenzhong. Introduction to Karst Science[M]. Beijing: The Commercial Press,1983.
[7]陈明浩,邓宏科,张广泽,等. 昭通隧道岩溶水文地质特征及突涌水危险性评价[J]. 高速铁路技术,2020,11(6): 34 - 39. CHEN Minghao,DENG Hongke,ZHANG Guangze,et al. Analysis of Karst Hydrogeological Characteristics and Risk Assessment of Water Inrush for the Zhaotong Tunnel[J]. High Speed Railway Technology,2020,11(6): 34 - 39.

相似文献/References:

[1]陈秦泷,王庆建,崔光耀.玉磨铁路隧道整体配套移动栈桥仰拱施工技术研究[J].高速铁路技术,2022,13(05):107.[doi:10.12098/j.issn.1674-8247.2022.05.021]
 CHEN Qinlong,WANG Qingjian,CUI Guangyao.Study on Construction Technology of Inverted Arch of Yuxi-Mohan Railway Tunnel by Using the Integrated Supporting Movable Trestle[J].HIGH SPEED RAILWAY TECHNOLOGY,2022,13(01):107.[doi:10.12098/j.issn.1674-8247.2022.05.021]
[2]崔光耀,陈秦泷,王明胜,等.片理化玄武岩隧道大变形影响因素分析[J].高速铁路技术,2022,13(06):12.[doi:10.12098/j.issn.1674-8247.2022.06.003 ]
 CUI Guangyao,CHEN Qinlong,WANG Mingsheng,et al.On Impact Factors of Large Deformation of Tunnels in Schistose Basalt[J].HIGH SPEED RAILWAY TECHNOLOGY,2022,13(01):12.[doi:10.12098/j.issn.1674-8247.2022.06.003 ]
[3]刘朝钦.软弱地层超大矩形顶管盾构隧道开挖面稳定性研究[J].高速铁路技术,2022,13(06):36.[doi:10.12098/j.issn.1674-8247.2022.06.007 ]
 LIU Chaoqin.Study on Stability of Excavation Face of Super-large Rectangular Pipe-jacking Shield Tunnel in Soft Ground[J].HIGH SPEED RAILWAY TECHNOLOGY,2022,13(01):36.[doi:10.12098/j.issn.1674-8247.2022.06.007 ]
[4]宿春亮.锦屏水电站辅助洞岩爆特征及防控技术研究[J].高速铁路技术,2023,14(02):75.[doi:10.12098/j.issn.1674-8247.2023.02.015]
 SU Chunliang.A Study on Rock Burst Characteristics and Prevention and Control Technology of Auxiliary Tunnel of Jinping Hydropower Station[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(01):75.[doi:10.12098/j.issn.1674-8247.2023.02.015]
[5]崔光耀,韩驰,王明胜,等.高地应力软岩隧道大变形机制及控制技术研究综述[J].高速铁路技术,2023,14(04):13.[doi:10.12098/j.issn.1674-8247.2023.04.003]
 CUI Guangyao,HAN Chi,WANG Mingsheng,et al.Review of Mechanism of Large Deformation in Soft Rock Tunnels with High Geo-stress and Its Control Techniques[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(01):13.[doi:10.12098/j.issn.1674-8247.2023.04.003]
[6]赵英伟.高烈度地震区倾斜隧道洞口段抗减震技术研究[J].高速铁路技术,2024,15(02):32.[doi:10.12098/j.issn.1674-8247.2024.02.006]
 ZHAO Yingwei.Study on Anti-seismic and Vibration Reduction Techniques for Inclined Tunnel Portal Sections in High Seismic Intensity Zones[J].HIGH SPEED RAILWAY TECHNOLOGY,2024,15(01):32.[doi:10.12098/j.issn.1674-8247.2024.02.006]
[7]李准,吴炜,马文景,等.基于隧道三台阶铣挖定额施工组织模型的数据误差处理研究[J].高速铁路技术,2024,15(04):8.[doi:10.12098/j.issn.1674-8247.2024.04.002]
 LI Zhun,WU Wei,MA Wenjing,et al.Study on Data Error Handling for Construction Organization Model Based on the Quota of Three-bench Cutting Excavation Method for Tunnels[J].HIGH SPEED RAILWAY TECHNOLOGY,2024,15(01):8.[doi:10.12098/j.issn.1674-8247.2024.04.002]
[8]何子阳,庄永香,郭艳军,等.强震区浅埋偏压隧道洞口段减震层减震效果分析[J].高速铁路技术,2024,15(04):56.[doi:10.12098/j.issn.1674-8247.2024.04.011]
 HE Ziyang,ZHUANG Yongxiang,GUO Yanjun,et al.Analysis on the Seismic Response Reduction of Shock Absorption Layer in the Shallow and Unsymmetrical Pressure Section of Tunnel Portal in Strong Earthquake Area[J].HIGH SPEED RAILWAY TECHNOLOGY,2024,15(01):56.[doi:10.12098/j.issn.1674-8247.2024.04.011]

备注/Memo

备注/Memo:
收稿日期:2021-11-18
作者简介:叶堃(1981-),男,高级工程师。
更新日期/Last Update: 2023-03-10