参考文献/References:
[1] 谢毅,肖杰. 高速铁路发展现状及趋势研究[J]. 高速铁路技术, 2021,12(2):23-26. XIE Yi,XIAO Jie. Research on High-speed Railway Development Status and Trend[J]. High Speed Railway Technology,2021, 12(2):23-26.
[2] 翟婉明,姚力,孙立,等. 基于车辆-轨道耦合动力学的400 km/h高速铁路线路平面参数设计研究[J]. 高速铁路技术,2021, 12(2):1-10,16. ZHAI Wanming,YAO Li,SUN Li,et al. Research on Route Plan Design Parameters of 400 km/h High-speed Railway Based on Vehicle-track Coupling Dynamics[J]. High Speed Railway Technology,2021,12(2):1-10,16.
[3] 陈兆玮,翟婉明. 基于列车振动的高速铁路桥墩沉降控制阈值[J]. 交通运输工程学报,2022,22(2):136-147. CHEN Zhaowei,ZHAI Wanming. Control Threshold of Pier Settlement in High-speed Railways Based on Train Vibrations[J]. Journal of Traffic and Transportation Engineering,2022,22(2):136-147.
[4] 龚循强,汪宏宇,鲁铁定,等. 基于RLM-MC的高速铁路桥墩沉降曲线预测方法[J]. 铁道学报,2022,44(10):142-149. GONG Xunqiang,WANG Hongyu,LU Tieding,et al. A Settlement Curve Prediction Method of High-speed Railway Bridge Pier Based on RLM-MC[J]. Journal of the China Railway Society,2022,44(10):142-149.
[5] 董亮,苏永华,袁磊. 地面堆卸载作用对铁路桥墩沉降的影响分析[J]. 铁道建筑,2019,59(5):51-55. DONG Liang,SU Yonghua,YUAN Lei. Influence of Ground Surcharge and Unloading on Settlement of Railway Bridge Pier[J]. Railway Engineering,2019,59(5):51-55.
[6] 周济民. 盾构区间隧道下穿高架桥桩基群施工技术与环境影响预测[J]. 现代隧道技术,2016,53(1):165-172. ZHOU Jimin. Construction Technology and Environmental Impact Prediction for a Shield Tunnel under a Viaduct Pile Foundation Group [J]. Modern Tunnelling Technology,2016,53(1):165-172.
[7] 孟长江,熊大生,赵海粟,等. 基坑降水对临近运营高铁桥墩的影响评估分析[J]. 岩土工程学报,2014,36(S2):265-268. MENG Changjiang,XIONG Dasheng,ZHAO Haisu,et al. Evaluation and Analysis of the Influence of Foundation Pit Dewatering on the Adjacent High-speed Rail Pier[J]. Chinese Journal of Geotechnical Engineering,2014,36(S2):265-268.
[8] 蒋小锐,黄杰,李楠. 城际铁路明挖隧道下穿既有高铁施工控制技术及标准探讨[J]. 铁道标准设计,2020,64(6):104-111. JIANG Xiaorui,HUANG Jie,LI Nan. Discussion on Construction Control Technology and Standard of Intercity-railway Undercrossing Existing High-speed Railway by Open-cut Tunnel[J]. Railway Standard Design,2020,64(6):104-111.
[9] 李士中. 京杭大运河新开挖航道对高速铁路桥墩的影响[J]. 铁道建筑,2020,60(8):33-36. LI Shizhong. Influence of Beijing-Hangzhou Grand Canal’s Newly Excavated Waterway on Bridge Pier of High Speed Railway[J]. Railway Engineering,2020,60(8):33-36.
[10]王国栋,王志杰,段明明,等. 铁路隧道下穿连续刚构桥墩施工影响及防控措施研究[J]. 铁道科学与工程学报,2017,14(11):2399-2406. WANG Guodong,WANG Zhijie,DUAN Mingming,et al. Research on the Construction Influence and Protection of Railway Tunnel Crossing beneath the Pier of Existing Continuous Rigid Frame Bridge [J]. Journal of Railway Science and Engineering,2017,14(11):2399-2406.
[11]TB 10101- 2018 铁路工程测量规范[S]. TB 10101- 2018 Code for Railway Engineering Survey[S].
[12]郭延辉,严明,宋琴,等. 深基坑开挖对临近既有高压天然气管道的影响[J]. 地下空间与工程学报,2021,17(S2):840-847. GUO Yanhui,YAN Ming,SONG Qin,et al. Influence of Deep Foundation Pit Excavation on Adjacent Existing High-pressure Natural Gas Pipeline[J]. Chinese Journal of Underground Space and Engineering,2021,17(S2):840-847.
[13]张碧文. 浅埋盾构下穿高铁路基沉降分析及控制[J]. 现代隧道技术,2013,50(2):109-113,126. ZHANG Biwen. Analysis and Control of High-speed Railway Subgrade Settlement Caused by Shallow-shield Tunnel Construction[J]. Modern Tunnelling Technology,2013,50(2):109-113,126.
相似文献/References:
[1]周川江,徐昕宇,郑晓龙,等.桥墩刚度对铁路大跨连续梁桥车桥耦合振动的影响研究[J].高速铁路技术,2022,13(06):23.[doi:10.12098/j.issn.1674-8247.2022.06.005
]
ZHOU Chuanjiang,XU Xinyu,ZHENG Xiaolong,et al.Study on the Influence of Pier Stiffness on Vehicle-bridge Coupled Vibration of Long-span Continuous Girder Bridge of Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2022,13(03):23.[doi:10.12098/j.issn.1674-8247.2022.06.005
]
[2]温贵生.灌河特大桥连续钢桁-柔性拱主桥建造技术[J].高速铁路技术,2023,14(01):76.[doi:10.12098/j.issn.1674-8247.2023.01.014]
WEN Guisheng.Construction Technology of Continuous Steel Truss-flexible Arch Main Bridge of Guanhe Super Major Bridge[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(03):76.[doi:10.12098/j.issn.1674-8247.2023.01.014]