BIM技术在高速铁路牵引变电所监控巡视系统工程设计中的应用研究()
分享到:

《高速铁路技术》[ISSN:1674-8247/CN:51-1730/U]

卷:
15卷
期数:
2024年03期
页码:
50-54
栏目:
研究创新
出版日期:
2024-06-20

文章信息/Info

Title:
Study on Application of BIM Technology in Design of Monitoring and Patrol System for High-speed Railway Traction Substation
文章编号:
1674-8247(2024)03-0050-05
作者:
杜熙
中铁二院工程集团有限责任公司, 成都 610031
Author(s):
DU Xi
China Railway Eryuan Engineering Group Co. ,Ltd. ,Chengdu 610031 ,China
关键词:
无人值班监控巡视BIM建模牵引变电所
Keywords:
unmanned operationmonitoring and patrolBIM modelingtraction substation
分类号:
U226
DOI:
10.12098/j.issn.1674-8247.2024.03.010
文献标志码:
A
摘要:
监控巡视系统作为牵引变电所无人值班模式的重要组成部分,其关键在于摄像设备的平面布置。监控巡视系统通过多台摄像设备配合完成全所视频、报警信号的采集,实现变电所现场巡视、监控和安防的目的。本文基于BIM技术三维仿真模拟监控巡视系统的摄像设备位置及视野,实现精简化、高效化的监控巡检系统布置,保证对牵引变电所设备视频全面覆盖,同时能够清晰观察开关设备状态等细节,满足无人值班变电所运行监控巡视的安全需求。将本文平面布置方法应用于西成客运专线牵引变电所无人值班改造工程中,结果表明:该方法适用于高速铁路牵引变电所无人值班改造,具有借鉴意义,值得研究推广。
Abstract:
The monitoring and patrol system constitutes a vital part of unmanned operation in traction substations. Through coordination of multiple cameras,it captures video signals and alarm signals across the entire substation,fulfilling the objectives of on-site patrols,monitoring,and security. The layout of these cameras is of paramount importance. This paper employed BIM technology to simulate the 3D positioning and field of view of the cameras of the system,enabling a streamlined and efficient design of the system. This ensures comprehensive coverage of video footage of the substation equipment while also providing clarity on details such as the status of switchgear,meeting the safety requirements for unmanned operation of traction substations. The application of the proposed layout method in the unmanned operation transformation of traction substations along Xi’an-Chengdu Passenger Dedicated Line demonstrates its suitability for unmanned operation of high-speed railway traction substations,making it a valuable subject for further study and promotion.

参考文献/References:

[1] 杜银龙. 视频安全监控系统在浙赣线牵引变电所的应用[J]. 电气化铁道,2008,19(5):13-15. DU Yinlong. Application of Video Monitoring System of Safety in Traction Substation of Zhejiang-Jiangxi Railway Line[J]. Electric Railway,2008,19(5):13-15.
[2] 刘毅. 实现无人值班牵引变电所应注意的问题[J]. 铁道运营技术,2012,18(4):44-46. LIU Yi. Problems Needing Attention in Realizing Unattended Traction Substation[J]. Railway Operation Technology,2012,18(4):44-46.
[3] 赵朝蓬,张利. 牵引变电所无人值班值守辅助监控系统接口标准化研究[J]. 电气化铁道,2019,30(S1):32-34. ZHAO Zhaopeng,ZHANG Li. Research on Interface Standardization of Unattended Auxiliary Monitoring System in Traction Substation[J]. Electric Railway,2019,30(S1):32-34.
[4] 李良威,李朝阳,徐剑,等. BIM技术在牵引供电系统设计中的应用研究[J]. 建筑电气,2014,33(4):36-39. LI Liangwei,LI Chaoyang,XU Jian,et al. Research on the Application of BIM Technology in the Design of Tractive Power Supply System[J]. Building Electricity,2014,33(4):36-39.
[5] 卢文波. BIM技术在高铁牵引变电所工程施工中的应用[J]. 电气化铁道,2019,30(2):99-102. LU Wenbo. Application of BIM Technology in Construction of Traction Substation of High Speed Railway[J]. Electric Railway, 2019,30(2):99-102.
[6] 常盛杰. 基于BIM模型的牵引变电所设备业务培训系统研究[J]. 铁路技术创新,2020(3):65-69. CHANG Shengjie. A BIM Model-based Professional Training System on Traction Substation Facilities[J]. Railway Technical Innovation, 2020(3):65-69.
[7] 黄鑫,鲁小兵. BIM技术在400 km/h高速铁路接触网工程中的应用[J]. 高速铁路技术,2021,12(5):102-106. HUANG Xin,LU Xiaobing. Application of BIM Technology to Overhead Contact System of 400 km/h High-speed Railway[J]. High Speed Railway Technology,2021,12(5):102-106.
[8] 刘江涛,胡光常. BIM在铁路设计中的应用研究[J]. 高速铁路技术,2014,5(5):5-9. LIU Jiangtao,HU Guangchang. A Study on BIM Application in Railway Design[J]. High Speed Railway Technology,2014,5(5):5-9.

备注/Memo

备注/Memo:
收稿日期:2023-06-28
作者简介:杜熙(1989-),男,高级工程师。
更新日期/Last Update: 2024-06-30