参考文献/References:
[1] 王希元, 张光源. 高速铁路引入枢纽(地区)电分相缓坡设置方案研究[J]. 高速铁路技术, 2024, 15(3): 81-86.
WANG Xiyuan, ZHANG Guangyuan. Study on Setting Scheme of Phase Break Gentle Slope for Leading High-speed Railway into Terminal(Area)[J]. High Speed Railway Technology, 2024, 15(3): 81-86.
[2] 杨佳, 杨洋, 鲁小兵, 等. 复杂艰险山区铁路接触网设计技术思考[J]. 高速铁路技术, 2023, 14(6): 35-38, 61.
YANG Jia, YANG Yang, LU Xiaobing, et al. Reflections on the Design Techniques for the Railway Overhead Contact System in Challenging Mountain Areas[J]. High Speed Railway Technology, 2023, 14(6): 35-38, 61.
[3] 胡家喜, 周方圆. 电气化铁路列车过分相技术现状及发展[J]. 机车电传动, 2019(3): 1-5.
HU Jiaxi, ZHOU Fangyuan. Status and Development of Neutral Section Passing Technology for Electrified Railway Trains[J]. Electric Drive for Locomotives, 2019(3): 1-5.
[4] 耿敬春. 基于CTCS-3级列控系统动车组列车自动过分相运行检算[J]. 铁道工程学报, 2010, 27(10): 93-98.
GENG Jingchun. Checking Calculation of Auto-passing Phase Splitting by CTCS-3-based EMU[J]. Journal of Railway Engineering Society, 2010, 27(10): 93-98.
[5] 郑景文, 刘明光, 崔玮辰, 等. 铁路隧道电分相结构参数与中性线过电压研究[J]. 铁道标准设计, 2020, 64(9): 146-150.
ZHENG Jingwen, LIU Mingguang, CUI Weichen, et al. Research on Structure Parameter of Phase Insulator in Railway Tunnel and Over-voltage of Neutral Line[J]. Railway Standard Design, 2020, 64(9): 146-150.
[6] 黄沁悦. 地面自动过分相技术研究[D]. 成都: 西南交通大学, 2018.
HUANG Qinyue. Research on Automatic Ground Crossing Phase Technology[D]. Chengdu: Southwest Jiaotong University, 2018.
[7] 刘雨欣, 张景景. 三断口八跨锚段关节式电分相过电压分析[J]. 电气化铁道, 2017, 28(3): 67-70.
LIU Yuxin, ZHANG Jingjing. Analysis of Over-voltage of Eight-span Overlap Section Type Phase Break with Three Breaks[J]. Electric Railway, 2017, 28(3): 67-70.
[8] 动车组过分相控制功能逻辑规范(V1.0)[S].
Logic Specification for Neutral Section Passing Control Function(V1.0)[S].
[9] 蒋威. 动车组变流器中间直流电压保持控制策略研究[J]. 机车电传动, 2019(2): 35-40.
JIANG Wei. Research on DC-link Voltage Hold Control Strategy for EMUs Converter[J]. Electric Drive for Locomotives, 2019(2): 35-40.
[10] TG/01A-2017 铁路技术管理规程(高速铁路部分)[S].
TG/01A-2017 Railway Technical Management Regulations(High Speed Railway Part)[S].
[11] 崔衍渠. 复杂运营条件下高速铁路电分相设计及运营建议[J]. 高速铁路技术, 2021, 12(4): 65-68.
CUI Yanqu. Suggestion for Design and Operation of Phase Break of High-speed Railway under Complex Operating Conditions[J]. High Speed Railway Technology, 2021, 12(4): 65-68.
[12] GB/T 36981-2018 轨道交通客运列车断电过分相系统相互匹配准则[S].
GB/T 36981-2018 Railway Applications-Technical Criteria for the Co-ordinations in the Passenger Train Neutral-section Passing System with No Power Consumption [S].
相似文献/References:
[1]王希元,张光源.高速铁路引入枢纽(地区)电分相缓坡设置方案研究[J].高速铁路技术,2024,15(03):81.[doi:10.12098/j.issn.1674-8247.2024.03.015]
WANG Xiyuan,ZHANG Guangyuan.Study on Setting Scheme of Phase Break Gentle Slope for Leading High-speed Railway into Terminal(Area)[J].HIGH SPEED RAILWAY TECHNOLOGY,2024,15(06):81.[doi:10.12098/j.issn.1674-8247.2024.03.015]