参考文献/References:
[1] 刘宝, 李丹峰. 重载铁路黄土路堑三联生态护坡入渗稳定性及应用研究[J]. 铁道勘察, 2022, 48(3): 57-62, 68.
LIU Bao, LI Danfeng. Infiltration Stability Analysis and Practical Application of Triple Ecological Protection for Loess Cutting Slope of the Heavy-haul Railway[J]. Railway Investigation and Surveying, 2022, 48(3): 57-62, 68.
[2] 王虎. 湿陷性黄土隧道重载条件下对隧道结构下部的影响分析[J]. 路基工程, 2023(6): 80-85.
WANG Hu. Analysis of Influence of Collapsible Loess Tunnel on the Lower Part of the Tunnel Structure under Heavy Load Conditions[J]. Subgrade Engineering, 2023(6): 80-85.
[3] 郑卫东. 重载铁路湿陷性黄土路基工程施工技术探讨[J]. 技术与市场, 2020, 27(9): 80-81.
ZHENG Weidong. Discussion on Construction Technology of Collapsible Loess Subgrade Engineering of Heavy-haul Railway[J]. Technology and Market, 2020, 27(9): 80-81.
[4] 杨碧峰, 杨晓华. 超长旋喷桩在黄土隧道软基加固中的应用[J]. 公路交通科技(应用技术版), 2007(5): 16-18.
YANG Bifeng, YANG Xiaohua. Application of Super-long Jet Grouting Pile in Soft Foundation Reinforcement of Loess Tunnel[J]. Journal of Highway and Transportation Research and Development, 2007(5): 16-18.
[5] 李小杰. 高压旋喷桩复合地基承载力与沉降计算方法分析[J]. 岩土力学, 2004, 25(9): 1499-1502.
LI Xiaojie. Analysis of Calculation Methods for Bearing Capacity and Settlement of High-pressure Chemical Churning Pile Composite Foundation[J]. Rock and Soil Mechanics, 2004, 25(9): 1499-1502.
[6] 朱丽刚. 浅埋大断面隧道黄土地层注浆预加固技术应用[J]. 新乡学院学报, 2023, 40(12): 49-53.
ZHU Ligang. Application of Grouting Pre-reinforcement Technology in Loess Stratum of Shallow Buried Large Section Tunnel[J]. Journal of Xinxiang University, 2023, 40(12): 49-53.
[7] WONGSAROJ J, SOGA K, MAIR R J. Tunnelling-induced Consolidation Settlements in London Clay[J]. Géotechnique, 2013, 63(13): 1103-1115.
[8] 方勇, 郭建宁, 康海波, 等. 富水地层公路隧道衬砌背后空洞对结构受力的影响[J]. 岩石力学与工程学报, 2016, 35(8): 1648-1658.
FANG Yong, GUO Jianning, KANG Haibo, et al. Influence of Voids Behind Lining on the Mechanical Behavior of Lining Structure of Highway Tunnel in Watery Strata[J]. Chinese Journal of Rock Mechanics and Engineering, 2016, 35(8): 1648-1658.
[9] 王瑞. 列车荷载下回填黄土铁路路堤的动力响应及其长期强度与沉降研究[D]. 西安: 长安大学, 2019.
WANG Rui. Study on Dynamic Response, Long-term Strength and Settlement of Railway Embankment Filled with Loess under Train Load [D]. Xi'an: Changan University, 2019.
[10] 孙文. 黄土隧道洞口段地震动力失稳机制及对策研究[D]. 兰州: 兰州交通大学, 2021.
SUN Wen. Study on Seismic Dynamic Instability Mechanism and Countermeasures of Loess Tunnel Entrance Section [D]. Lanzhou: Lanzhou Jiatong University, 2021.
[11] 梁金平. 地基加固成桩对邻近高速铁路变形影响研究[J]. 高速铁路技术, 2023, 14(5): 13-17, 87.
LIANG Jinping. A Study on Impact of Foundation Reinforcement Piles on Deformation of Adjacent High-speed Railways[J]. High Speed Railway Technology, 2023, 14(5): 13-17, 87.
[12] 陈朝阳. 黄土地区浅埋铁路隧道施工控制关键技术研究[D]. 石家庄铁道大学, 2020.
CHEN Chaoyang. Research on Key Technology of Construction Control of Shallow Buried Railway Tunnel in Loess Area[D]. Shijiazhuang Railway University, 2020.
[13] 丁祖德. 高速铁路隧道基底软岩动力特性及结构安全性研究[D]. 长沙: 中南大学, 2012.
DING Zude. Study on Dynamic Characteristics and Structural Safety of Soft Rock at the Base of High-speed Railway Tunnel[D]. Changsha: Central South University, 2012.
[14] 张亚辉, 安洋, 郭唯伟, 等. 围岩空洞对重载铁路隧道动力稳定性的影响[J]. 铁道勘察, 2023, 49(4): 135-141.
ZHANG Yahui, AN Yang, GUO Weiwei, et al. Influence of Surrounding Rock Voids on the Dynamic Stability of Heavy-haul Railway Tunnels[J]. Railway Investigation and Surveying, 2023, 49(4): 135-141.
[15] 罗军, 王炳龙, 陕耀, 等. 邻近高速铁路单根高压旋喷桩施工对周围土体的变形影响[J]. 高速铁路技术, 2023, 14(1): 13-19.
LUO Jun, WANG Binglong, SHAN Yao, et al. Deformation Impact of Construction of a Single High-pressure Jet Grouting Pile in the Vicinity of a High-speed Railway on Surrounding Soil Mass[J]. High Speed Railway Technology, 2023, 14(1): 13-19.
[16] Yahui Z. Prediction Model of Surrounding Rock Deformation in Double-continuous-arch Tunnel based on the ABC-WNN [J]. Railway Sciences, 2024, 3(6): 717-730.
相似文献/References:
[1]张 巍.重载铁路煤炭装载系统与车站布局探讨[J].高速铁路技术,2017,8(06):50.[doi:10.12098/j.issn.1674-8247.2017.06.011]
ZHANG Wei.Discussionon Coal Loading System and Station Layout of Heavy-haul Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2017,8(06):50.[doi:10.12098/j.issn.1674-8247.2017.06.011]
[2]冉惟可.电气化铁路隧道内接触网电缆挂架优化及安装形式研究[J].高速铁路技术,2023,14(01):43.[doi:10.12098/j.issn.1674-8247.2023.01.008]
RAN Weike.A Study on Optimization and Installation Form of Cable Hanger of Overhead Contact System in Electrified Railway Tunnels[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(06):43.[doi:10.12098/j.issn.1674-8247.2023.01.008]
[3]曹 博,李明,刘俊俊,等.重载铁路路堑边坡极限状态法稳定性分析研究[J].高速铁路技术,2023,14(05):56.[doi:10.12098/j.issn.1674-8247.2023.05.011]
CAO Bo,LI Ming,LIU Junjun,et al.A Study on Stability Analysis for Cutting Slope of Heavy Haul Railway by Limit State Method[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(06):56.[doi:10.12098/j.issn.1674-8247.2023.05.011]