参考文献/References:
[1] 交通运输部. 2022年交通运输行业发展统计公报[EB/OL].(2023-06-21)[2024-01-31]. https://www.gov.cn/lianbo/bumen/202306/content_6887539.htm.
Ministry of Transport. Statistical Bulletin on the Development of the Transportation Industry in 2022 [EB/OL].(2023-06-21)[2024-01-31]. https://www.gov.cn/lianbo/bumen/202306/content_6887539.htm.
[2] 崔光耀, 韩驰, 王明胜, 等. 高地应力软岩隧道大变形机制及控制技术研究综述[J]. 高速铁路技术, 2023, 14(4): 13-18.
CUI Guangyao, HAN Chi, WANG Mingsheng, et al. Review of Mechanism of Large Deformation in Soft Rock Tunnels with High Geo-stress and Its Control Techniques[J]. High Speed Railway Technology, 2023, 14(4): 13-18.
[3] 马伟斌. 铁路山岭隧道钻爆法关键技术发展及展望[J]. 铁道学报, 2022, 44(3): 64-85.
MA Weibin. Development and Prospect of Key Technology of Drilling and Blasting for Railway Mountain Tunnels[J]. Journal of the China Railway Society, 2022, 44(3): 64-85.
[4] 李丰果. 山岭隧道钻爆法开挖的一些建议措施[J]. 西部探矿工程, 2021, 33(11): 183-184, 190.
LI Fengguo. Some Suggestions for Excavation of Mountain Tunnel by Drilling and Blasting Method[J]. West-China Exploration Engineering, 2021, 33(11): 183-184, 190.
[5] 李俊均. 钻爆法隧道开挖与支护关键技术[J]. 中国公路, 2020(11): 87-89.
LI Junjun. Key Technology of Tunnel Excavation and Support by Drilling and Blasting Method[J]. China Highway, 2020(11): 87-89.
[6] 杨家松. 大断面软岩隧道钻爆法开挖技术分析[J]. 路基工程, 2013(4): 158-161.
YANG Jiasong. Analysis on Technology of Excavation with Drilling and Blasting for Soft Rock Tunnel with Large Cross-section[J]. Subgrade Engineering, 2013(4): 158-161.
[7] 周荣. 隧道钻爆开挖设备配置优化及研究[J]. 铁道工程学报, 2016, 33(12): 82-87.
ZHOU Rong. Optimization and Study of Allocation of Drill and Blast Excavation Equipment for High-speed Railway Tunnels[J]. Journal of Railway Engineering Society, 2016, 33(12): 82-87.
[8] 喻业洪. 隧道机械化及配套智能化管控施工技术[J]. 低碳世界, 2021, 11(5): 271-272.
YU Yehong. Tunnel Mechanization and Supporting Intelligent Control Construction Technology[J]. Low Carbon World, 2021, 11(5): 271-272.
[9] 郭光旭, 王恩选. 软弱围岩隧道智能机械化配套施工技术探讨与展望[J]. 高速铁路技术, 2020, 11(3): 101-107.
GUO Guangxu, WANG Enxuan. Discussion and Prospect of Intelligent Mechanized Construction Technology for Soft Surrounding Rock Tunnel[J]. High Speed Railway Technology, 2020, 11(3): 101-107.
[10] 王安东. 水平层状岩地区隧道围岩荷载计算方法[J]. 高速铁路技术, 2023, 14(1): 32-37.
WANG Andong. Calculation Method for Rock Load of Tunnels in the Horizontal Stratified Rock Area[J]. High Speed Railway Technology, 2023, 14(1): 32-37.
[11] 李洋, 马留闯, 王峰. 古夫隧道软弱围岩普通型机械化配套试验性施工技术[J]. 隧道建设(中英文), 2018, 38(8): 1371-1378.
LI Yang, MA Liuchuang, WANG Feng. Experimental Construction Technology of Conventional Mechanized Support for Weak Surrounding Rock in Gufu Tunnel[J]. Tunnel Construction, 2018, 38(8): 1371-1378.
[12] 王志坚. 郑万铁路隧道智能化建造技术创新实践[J]. 中国铁路, 2020(12): 10-19.
WANG Zhijian. Innovative Practices of Intelligent Tunnel Construction Technology for Zhengzhou-Wanzhou Railway[J]. China Railway, 2020(12): 10-19.
[13] 张军, 麻建飞, 刘夏冰, 等. 浅埋超大跨隧道洞口段围岩稳定性研究[J]. 高速铁路技术, 2023, 14(6): 7-12, 18.
ZHANG Jun, MA Jianfei, LIU Xiabing, et al. A Study on Rock Stability in Portal Section of Shallow Extra-large-span Tunnel[J]. High Speed Railway Technology, 2023, 14(6): 7-12, 18.
[14] 陈仁超. 铁路隧道软弱围岩在安全步距下快速施工技术研究[J]. 高速铁路技术, 2016, 7(1): 84-90.
CHEN Renchao. Research on Fast Construction Technology of Weak Surrounding Rock in Railway Tunnel under Safe Distance[J]. High Speed Railway Technology, 2016, 7(1): 84-90.
[15] 韩自力. 隧道智能建造关键技术与发展趋势[J]. 铁道建筑, 2020, 60(4): 9-16.
HAN Zili. Key Technology and Development Trend of Intelligent Construction of High Speed Railway Tunnel[J]. Railway Engineering, 2020, 60(4): 9-16.
[16] 赵琛, 周勇, 赵军. 软弱围岩大断面隧道光面爆破优化[J]. 山东交通科技, 2022(1): 40-42.
ZHAO Chen, ZHOU Yong, ZHAO Jun. Smooth Blasting Design of Large Section Tunnel [J]. Shandong Traffic Science and Technology, 2022(1): 40-42.
[17] 王少锋, 石鑫垒, 周子龙. 硬岩非爆机械化采掘技术发展与展望[J]. 金属矿山, 2024(5): 1-15.
WANG Shaofeng, SHI Xinlei, ZHOU Zilong. Development and Prospect of Non-blasting Mechanized Mining and Heading Technology in Hard Rock[J]. Metal Mine, 2024(5): 1-15.
[18] 韩会军, 乔栋磊, 何聪, 等. 高地应力隧道软岩大变形预测分析及控制措施[J]. 金属矿山, 2023(2): 49-57.
HAN Huijun, QIAO Donglei, HE Cong, et al. Prediction Analysis and Control Measures of Large Deformation of Soft Rock in High Ground Stress Tunnel[J]. Metal Mine, 2023(2): 49-57.
[19] 段宝福, 张正欣, 张春武, 等. 减振孔参数降振作用的灰色关联度分析[J]. 金属矿山, 2022(7): 97-104.
DUAN Baofu, ZHANG Zhengxin, ZHANG Chunwu, et al. Grey Correlation Analysis of Vibration Reduction Effect of Damping Hole Parameters[J]. Metal Mine, 2022(7): 97-104.
[20] DL/T 5389-2007 水工建筑物岩石基础开挖工程施工技术规范 [S].
DL/T 5389-2007 Construction Technical Specifications on Rock-foundation Excavating Engineering of Hydraulic Structures [S].