[1]孙凤祥,左少群,李江.张吉怀铁路酉水大桥非对称拱桥钢拱肋架设技术研究[J].高速铁路技术,2024,(02):102-107,118.[doi:10.12098/j.issn.1674-8247.2024.02.019]
 SUN Fengxiang,ZUO Shaoqun,LI Jiang.Study on Erection Technology for Steel Arch Rib of Unsymmetrical Arch Bridge for Youshui Bridge on Zhangjiajie-Jishou-Huaihua Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2024,(02):102-107,118.[doi:10.12098/j.issn.1674-8247.2024.02.019]
点击复制

张吉怀铁路酉水大桥非对称拱桥钢拱肋架设技术研究()
分享到:

《高速铁路技术》[ISSN:1674-8247/CN:51-1730/U]

卷:
期数:
2024年02期
页码:
102-107,118
栏目:
施工技术
出版日期:
2024-04-30

文章信息/Info

Title:
Study on Erection Technology for Steel Arch Rib of Unsymmetrical Arch Bridge for Youshui Bridge on Zhangjiajie-Jishou-Huaihua Railway
文章编号:
1674-8247(2024)02-0102-06
作者:
孙凤祥左少群李江
中铁大桥局集团第五工程有限公司, 江西?九江 332001
Author(s):
SUN FengxiangZUO ShaoqunLI Jiang
The Fifth Engineering Co. ,Ltd. of China Railway Major Bridge Engineering Group Co. ,Ltd. , Jiujiang 332001 ,China
关键词:
张吉怀铁路酉水大桥非对称钢管混凝土拱桥钢拱肋斜拉扣挂法施工技术
Keywords:
Zhangjiajie-Jishou-Huaihua RailwayYoushui Bridgeasymmetric concrete-filled steel tube arch bridgesteel arch ribcable-stayed buckling methodconstruction technology
分类号:
U448.22;U445.4
DOI:
10.12098/j.issn.1674-8247.2024.02.019
文献标志码:
A
摘要:
张吉怀铁路酉水大桥主桥为主跨292m的非对称上承式钢管混凝土拱桥,其钢拱肋采用斜拉扣挂法进行节段悬臂架设施工。本文结合张吉怀铁路酉水大桥工程,针对高速铁路非对称拱桥钢拱肋安装施工技术展开研究,主要包括:复杂地形条件下的施工技术,因地制宜地进行缆索起重机的设计及安装,钢管拱整节段拼装和架设,合龙装置和技术等。该施工技术保障了钢拱肋架设的精度和质量,钢拱肋的成拱线形与设计值较为吻合。该桥运营以来,各结构性能指标均满足设计要求。
Abstract:
Youshui Bridge on Zhangjiajie-Jishou-Huaihua Railway is a main bridge with a main span of 292 m,and it is an asymmetric upper-arch concrete-filled steel tube arch bridge,whose steel arch ribs were erected using the inclined cable-stayed buckling method for segmental cantilever construction. The paper focuses on the erection technology for the steel arch ribs of asymmetric arch bridge of high-speed railways,for which Youshui Bridge on Zhangjiajie-Jishou-Huaihua Railway was taken as an case for study. The contents of this study mainly include construction technology under complex terrain conditions,design and installation of cable cranes according to local conditions,assembly and erection of steel tube arch segments,and the closure device and technology,etc. The above construction technologies ensure the accuracy and quality of the steel arch rib erection,and the shape of the steel arch rib closely matches the design values. Since the operation of the bridge,all structural performance indicators have met the design requirements.

参考文献/References:

[1]? 严爱国,夏正春,张杰,等. 张吉怀铁路芙蓉镇酉水大桥方案比选
[2]? 张杰,严爱国,郭远航. 主跨292 m非对称上承式拱桥结构设计研究[J]. 铁道标准设计,2020,64(S1):142-146. ZHANG Jie,YAN Aiguo,GUO Yuanhang. Study on Structural Design of Asymmetric Deck Arch Bridge with Main Span of 292 m[J]. Railway Standard Design,2020,64(S1):142-146.
[3]? 王睿. 高原山区大跨度铁路拱桥施工关键技术[J]. 桥梁建设, 2020,50(1):105-110. WANG Rui. Key Construction Techniques for Long-span Railway Arch Bridge in Mountainous Region of Plateau[J]. Bridge Construction,2020,50(1):105-110.
[4]? 林祥. 贵州林织铁路纳界河特大桥修建关键技术[J]. 高速铁路技术,2018,9(S2):118-121. LIN Xiang. Key Technologies for the Construction of Najiehe Bridge on Guizhou Linzhi Railway[J]. High Speed Railway Technology, 2018,9(S2):118-121.
[5]? 李艳哲. 成贵铁路鸭池河特大桥主桥施工技术[J]. 桥梁建设, 2020,50(5):16-21. LI Yanzhe. Key Construction Techniques for Main Bridge of Yachi River Bridge on Chengdu-Guiyang Railway[J]. Bridge Construction,2020,50(5):16-21.
[6]? 林鹏. 成贵铁路鸭池河特大桥拱肋架设二次横移技术[J]. 桥梁建设,2019,49(2):114-118. LIN Peng. Techniques for Secondary Transverse Movement in Erecting Arch Rib of Main Bridge of Guizhou Yachi River Bridge on Chengdu-Guiyang Railway[J]. Bridge Construction,2019,49(2):114-118.
[7]? 王亚维. 成贵铁路贵州鸭池河特大桥主桥拱肋架设施工技术[J]. 桥梁建设,2017,47(1):104-108. WANG Yawei. Construction Techniques for Erection of Arch Rib of Main Bridge of Guizhou Yachi River Bridge on Chengdu-Guiyang Railway[J]. Bridge Construction,2017,47(1):104-108.
[8]? 张春新. 西江特大桥钢箱提篮拱架设施工技术[J]. 桥梁建设, 2015,45(5):7-12. ZHANG Chunxin. Construction Techniques for Erection of Steel Box Basket Handle Arch of Xijiang River Bridge[J]. Bridge Construction,2015,45(5):7-12.
[9]? 赵剑发. 准朔铁路黄河特大桥主桥钢管拱架设方案比选[J]. 桥梁建设,2015,45(1):108-113. ZHAO Jianfa. Comparison of Erection Schemes for Steel Tube Arch of Main Bridge of Huanghe River Bridge on Zhungeer-Shuozhou Railway [J]. Bridge Construction,2015,45(1):108-113.