参考文献/References:
[1] 铁道部第三勘测设计院.铁路工程设计技术手册:桥渡水文[M]. 北京:中国铁道出版社,1993.
Third Survey and Design Institute, MOR. Technical Manual for Railway Engineering and Design: Bridge Hydrology[M].Beijing: China Railway Publishing House,1993.
[2] 铁道部第二勘测设计院.山区铁路桥梁水害的诌见——从宝成铁路略(阳)广(元)段水害中对铁路桥梁勘测设计的认识[Z]. 成都:铁道部第二勘测设计院,1982.
China Railway Eryuan Engineering Group Co.,Ltd. The Preliminary Opinions to the Flood Hazard to Bridges at Mountainous Regions——The Knowledge Acquired from Flood Hazard to the Bridges of the Section Between Lueyang and Guanyuan of Baoji-Chengdu Railway[Z]. Chengdu: China Railway Eryuan Engineering Group Co.,Ltd., 1982.
[3] TB 10017-99 铁路水文工程勘测设计规范[S].
TB 10017-99 Code for Survey and Design on Hydrology of Railway Engineering[S].
[4] 高冬光.公路桥涵设计手册——桥位设计[M].北京:人民交通出版社,2001.
GAO Dongguang. Design Manual for Highway Bridge and Culvert——Bridge Location Design[M].Beijing: China Communications Press, 2001.
[5] 中铁二院工程集团有限责任公司.新建高速铁路勘察细则[Z].成都:中铁二院工程集团有限责任公司,2010.
China Railway Eryuan Engineering Group Co.,Ltd. Detailed Rules of Newly-Constructed High-speed Railway Survey[Z]. Chengdu:China Railway Eryuan Engineering Group Co.,Ltd., 2010.
[6] 中铁二院工程集团有限责任公司.新建铁路勘察细则[Z].成都:中铁二院工程集团有限责任公司,2010.
China Railway Eryuan Engineering Group Co.,Ltd. Detailed Rules of Newly-Constructed Railway Survey[Z]. Chengdu:China Railway Eryuan Engineering Group Co.,Ltd., 2010.
[7] 中铁二院工程集团有限责任公司.改建铁路勘察细则[Z].成都:中铁二院工程集团有限责任公司,2010.
China Railway Eryuan Engineering Group Co.,Ltd. Detailed Rules of Reconstructed Railway Survey[Z]. Chengdu: China Railway Eryuan Engineering Group Co.,Ltd., 2010.
[8] 游励晖,陈思孝.西南山区铁路桥梁设计的几点思考[J]. 高速铁路技术,2015,6(5): 78-82.
YOU Lihui,CHEN Sixiao.Thoughts on Design of Railway Bridge in Southwest Mountain Aear[J].High Speed Railway Technology, 2015,6(5): 78-82.