参考文献/References:
[1] 中铁二院工程集团有限责任公司. 新建川藏铁路拉萨至林芝段可行性研究总说明书[Z]. 成都:中铁二院工程集团有限责任公司,2012.
China Railway Eryuan Engineering Group Co.,Ltd. General Specification for Feasibility Study of Lasa-Linzhi Railway Line[Z]. Chengdu: China Railway Eryuan Engineering Group Co.,Ltd., 2012.
[2] GB 50090-2006 铁路线路设计规范[S].
GB 50090-2006 Code for design of railway line[S].
[3] 林世金. 困难山区铁路的设计体会[J]. 铁道工程学报,2007,4(4):7-10.
LIN Shijin. Experiences from Design of Railways in Difficult Mountain Area[J]. Journal of Railway Engineering Society, 2007,4(4):7-10.
[4] 朱颖. 复杂艰险山区铁路选线与总体设计论文集[M]. 北京:中国铁道出版社,2010.
ZHU Ying. Proceedings of Railway Route Selection and Overall Design in Complicated and Dangerous Mountain Area[M]. Beijing: China Railway Publishing House,2010.
[5] 何学刚. 湘渝铁路增建第二线创新思路探讨[J]. 路基工程,2008,26(4):82-83.
HE Xuegang. Discussion on the Innovation of adding second track to the existing Xiangyang-Chongqin Railway Line[J]. Subgrade Engineering, 2008,26(4):82-83.
[6] 朱颖. 工程风险设计理念与措施研究[J]. 中国勘察设计,2009,25(7):32-35.
ZHU Ying. Study on Design Concept and Measure for Avoiding Engineering Risk[J]. China Investigation & Design, 2009,25(7):32-35.
[7] 易思蓉.铁路选线设计[M]. 成都:西南交通大学出版社,2005.
YI Sirong. Design of Railway Line Selection[M]. Chengdu: Southwest Jiaotong University Press,2005.
[8] 乐重.铁路综合选线原则思考[J].高速铁路技术,2015,6(3): 54-58.
YUE Zhong. Thoughts about Principle for Integrated Railway Route Selection[J].High Speed Railway Technology, 2015,6(3): 54-58.