Title:
Application of BIM in Integrated Commissioning and Testing of High-speed Railway Signal System
文章编号:
1674—8247(2019)01—0011-03
作者:
徐效宁 汪洋 王菲 万林
中国铁道科学研究院集团有限公司, 北京 100081
Author(s):
XU Xiaoning WANG Yang WANG Fei WAN Lin
China Academy of Railway Sciences Corporation Limited, Beijing 100081, China
关键词:
BIM|高速铁路|信号系统|联调联试
Keywords:
Building Information Modeling (BIM)|high-speed railway|signal system|integrated commissioning and testing
分类号:
U284
DOI:
10.12098/j.issn.1674-8247.2019.01.003
文献标志码:
A
摘要:
高速铁路信号系统由于其高安全完整性等级(SIL)要求,联调联试通常由独立第三方进行,这在保证测试结果客观性的同时,也易造成测试与线路设计施工的脱节,不利于测试中发现问题。文章首先介绍了BIM技术特点和高速铁路信号系统联调联试的目的和内容;然后,从联调联试的角度,对高速铁路信号系统进行分层,提出建立高速铁路信号系统的BIM模型;最后,将BIM模型应用于信号系统联调联试,分别提出直观验证和软件实现2种方案。通过将BIM技术和思想应用于高速铁路信号联调联试,能够提高自动化程度,为我国铁路其它专业联调联试和动态检测提供一定的参考。
Abstract:
Due to the high security integrity level (SIL) requirements of high-speed railway signal system, integrated commissioning and testing is usually carried out by independent third party, which is helpful to guarantee the objectivity of test results, but easily leads to the disconnection between testing, and design and construction of the line and is not conducive to discovery of the problems in testing. This paper has introduced the characteristics of BIM technology and the purpose and content of integrated commissioning and testing of high-speed railway signal system. Then, from the angle of integrated commissioning and testing, this paper has stratified the high-speed railway signal system and put forward the BIM model of the high-speed railway signal system. Finally, the BIM model has been applied to integrated commissioning and testing, and two schemes of visual verification and software implementation are proposed respectively.