[1]王佩雷.复杂艰险山区高速铁路建设四电接口管理技术研究[J].高速铁路技术,2023,14(01):38-42,67.[doi:10.12098/j.issn.1674-8247.2023.01.007]
 WANG Peilei.A Study on Interface Management Technology of Communication, Signal,Electrical,and Electrification Systems for High-speed Railway Construction in Challenging Mountain Areas[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(01):38-42,67.[doi:10.12098/j.issn.1674-8247.2023.01.007]
点击复制

复杂艰险山区高速铁路建设四电接口管理技术研究()
分享到:

《高速铁路技术》[ISSN:1674-8247/CN:51-1730/U]

卷:
14卷
期数:
2023年01期
页码:
38-42,67
栏目:
出版日期:
2023-03-10

文章信息/Info

Title:
A Study on Interface Management Technology of Communication, Signal,Electrical,and Electrification Systems for High-speed Railway Construction in Challenging Mountain Areas
文章编号:
1674-8247(2023)01-0038-05
作者:
王佩雷
沪昆铁路客运专线贵州有限公司,贵阳550003
Author(s):
WANG Peilei
Guizhou Co. ,Ltd. of Shanghai-Kunming Railway Passenger Dedicated Line ,Guiyang 550003 ,China
关键词:
高速铁路 接口管理 识别表 执行 评价技术
Keywords:
high-speed railwayinterface managementidentification formexecutionevaluation technology
分类号:
U227
DOI:
10.12098/j.issn.1674-8247.2023.01.007
文献标志码:
A
摘要:
高速铁路建设是一项极其复杂庞大的系统工程,四电系统专业相关的接口众多、技术难度高、协调工作量大,需对其进行深入研究以确保建设质量。本文针对复杂艰险山区高速铁路建设工作建设中四电专业存在的主要接口内容及问题,使用接口管理的理论对其特征进行分析,提出接口管理工作的目标及要求,并通过科学应用系统性识别、执行管理、优化和细化、评价反馈等管理关键技术,提出铁路建设管理的具体工作建议,满足铁路建设整体管理目标。
Abstract:
The construction of a high-speed railway is an extremely complex and huge systematic project. There are many interfaces related to communication,signal,electrical,and electrification systems,which are technically difficult and re-quire a large amount of coordination work,and in-depth research is required to ensure construction quality. This paper an-alyzed the characteristics of the main contents and problems of interfaces existing in the construction of high-speed railways in challenging mountain areas by using the theory of interface management,identify the objectives and requirements of in-terface management,and put forward specific suggestions for railway construction management by scientifically applying key management technologies such as systematic identification,execution management,optimization and refinement,evalua-tion and feedback,etc.,so as to meet the overall management objectives of railway construction.

参考文献/References:

[1]铁总工管〔2016〕99号,铁路建设项目工程接口管理办法[S]. Tie Zong Gong Guan〔2016〕No. 99, Measures for Management of Engineering Interfaces of Railway Construction Projects[S].[2]? 中铁二院工程集团有限责任公司. 长大干线四电系统集成技术深化研究报告[R]. 成都: 中铁二院工程集团有限责任公司, 2011. China Railway Eryuan Engineering Group Co. ,Ltd. Research Report on Deepening Integration Technology of Communication,Signal,
[3]侯卫星,王祖峰,姚建伟,等. 高速铁路系统集成接口管理方法研究及工程实践[J]. 中国铁路,2009(7): 7 - 13. HOU Weixing,WANG Zufeng,YAO Jianwei,et al. Research and Engineering Practice of Integrated Interface Management Method for High-Speed Railway System[J]. Chinese Railways,2009(7): 7 -13.
[4]张曙光. 超大型工程系统集成理论与实践[M]. 北京: 科学出版社,2007. ZHANG Shuguang. Theory and Implementation of Super Large-scale Project System Integration[M]. Beijing: Science Press,2007.[5]? 李剑. 客运专线系统集成接口体系管理的探讨[J]. 高速铁路技术,2011,2(1): 1 - 3. LI Jian. On the Management of System Integration Interface for the Passenger Dedicated Line[J]. High Speed Railway Technology, 2011,2(1): 1 - 3.
[6]刘杰. 高速铁路站场专业设计接口探讨[J]. 高速铁路技术, 2021,12(6): 95 - 99. LIU Jie. On the Design Interfaces of High-Speed Railway Station and Yard Discipline[J]. High Speed Railway Technology,2021,12(6):95 - 99.
[7]肖莹. 高速铁路项目施工接口管理研究[D]. 长沙: 中南大学, 2012. XIAO Ying. Research on Construction Interface Management of High-speed Railway Project[D]. Changsha: Central South University,2012.
[8]吕继涛. 铁路客运专线建设接口工程管理[J]. 铁路技术创新, 2010(1): 92 - 94. LV Jitao. Management of Interface Project in Railway Passenger Dedicated Line Construction[J]. Railway Technical Innovation, 2010(1): 92 - 94.

相似文献/References:

[1]王 旭.长大干线高速铁路自动化沉降监测系统研究[J].高速铁路技术,2017,8(06):68.[doi:10.12098/j.issn.1674-8247.2017.06.014]
 WANG Xu.Research of Automatic Settlement Monitoring System for Long Trunk High Speed Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2017,8(01):68.[doi:10.12098/j.issn.1674-8247.2017.06.014]
[2]陈兴海,王朋,于翠翠.鲁南某高速铁路岩溶塌陷风险评估及防治对策[J].高速铁路技术,2022,13(05):79.[doi:10.12098/j.issn.1674-8247.2022.05.016]
 CHEN Xinghai,WANG Peng,YU Cuicui.Risk Assessment and Countermeasures for Karst Collapse of a Highspeed Railway in Southern Shandong[J].HIGH SPEED RAILWAY TECHNOLOGY,2022,13(01):79.[doi:10.12098/j.issn.1674-8247.2022.05.016]
[3]林奎.成自铁路引入天府机场线路方案比选回顾[J].高速铁路技术,2022,13(05):91.[doi:10.12098/j.issn.1674-8247.2022.05.018]
 LIN Kui.Review of Comparison and Selection of Route Plans for the Connection of the Chengdu-Zigong High-speed Railway to Tianfu Airport[J].HIGH SPEED RAILWAY TECHNOLOGY,2022,13(01):91.[doi:10.12098/j.issn.1674-8247.2022.05.018]
[4]周宏,宋元胜.高速铁路引入铁路枢纽线路选线研究[J].高速铁路技术,2022,13(05):96.[doi:10.12098/j.issn.1674-8247.2022.05.019]
 ZHOU Hong,SONG Yuansheng.Study on Route Selection for Introducing High-speed Railways into Railway Hubs[J].HIGH SPEED RAILWAY TECHNOLOGY,2022,13(01):96.[doi:10.12098/j.issn.1674-8247.2022.05.019]
[5]陈 浩.基于动力分析的高速铁路钢轨磨耗预测方法研究[J].高速铁路技术,2022,13(06):17.[doi:10.12098/j.issn.1674-8247.2022.06.004 ]
 CHEN Hao.Study on Prediction Method of Rail Wear of High-speed Railway Based on Dynamic Analysis[J].HIGH SPEED RAILWAY TECHNOLOGY,2022,13(01):17.[doi:10.12098/j.issn.1674-8247.2022.06.004 ]
[6]董月龙.金建高速铁路大中河流水文计算分析[J].高速铁路技术,2022,13(06):79.[doi:10.12098/j.issn.1674-8247.2022.06.015 ]
 DONG Yuelong.Hydrological Calculation and Analysis of Large and Medium Rivers along Jinhua-Jiande High-speed Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2022,13(01):79.[doi:10.12098/j.issn.1674-8247.2022.06.015 ]
[7]戴龙钦,余少华,蔡康.合福高速铁路闽赣段防洪对策分析[J].高速铁路技术,2023,14(01):91.[doi:10.12098/j.issn.1674-8247.2023.01.017]
 DAI Longqin,YU Shaohua,CAI Kang.Analysis of Flood Control Measures for Fujian-Jiangxi Section of Hefei-Fuzhou High-speed Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(01):91.[doi:10.12098/j.issn.1674-8247.2023.01.017]
[8]尹航.沪渝蓉高速铁路(宜涪段)马鹿箐隧道选线研究[J].高速铁路技术,2023,14(01):106.[doi:10.12098/j.issn.1674-8247.2023.01.020]
 YIN Hang.A Study on Route Selection of Maluqing Tunnel of Shanghai-Chongqing-Chengdu High-speed Railway(Yichang-Fuling Section)[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(01):106.[doi:10.12098/j.issn.1674-8247.2023.01.020]
[9]任俊桦.基于类比分析的高速铁路和城际铁路运量预测研究[J].高速铁路技术,2023,14(01):54.[doi:10.12098/j.issn.1674-8247.2023.01.010]
 REN Junhua.A Study on Forecast of Traffic Volume for High-speed Railway and Intercity Railway Based on Analog Analysis[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(01):54.[doi:10.12098/j.issn.1674-8247.2023.01.010]
[10]陈明浩,李东,张广泽,等.西南山区高速铁路主要工程地质问题研究[J].高速铁路技术,2023,14(02):1.[doi:10.12098/j.issn.1674-8247.2023.02.001]
 CHEN Minghao,LI Dong,ZHANG Guangze,et al.A Study on Main Geological Problems of High-speed Railway in the Mountainous Area in Southwest China[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(01):1.[doi:10.12098/j.issn.1674-8247.2023.02.001]

备注/Memo

备注/Memo:
收稿日期:2022-10-23
作者简介:王佩雷(1970-),男,高级工程师。
更新日期/Last Update: 2023-03-10