[1]何国军.安九高速铁路庐山站接触网改造及过渡设计研究[J].高速铁路技术,2023,14(06):84-88.[doi:10.12098/j.issn.1674-8247.2023.06.016]
 HE Guojun.A Study on Renovation and Transition Design of Overhead Contact System in Lushan Station of Anqing-Jiujiang High-speed Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(06):84-88.[doi:10.12098/j.issn.1674-8247.2023.06.016]
点击复制

安九高速铁路庐山站接触网改造及过渡设计研究()
分享到:

《高速铁路技术》[ISSN:1674-8247/CN:51-1730/U]

卷:
14卷
期数:
2023年06期
页码:
84-88
栏目:
勘察设计
出版日期:
2023-12-30

文章信息/Info

Title:
A Study on Renovation and Transition Design of Overhead Contact System in Lushan Station of Anqing-Jiujiang High-speed Railway
文章编号:
1674-8247(2023)06-0084-05
作者:
何国军
中铁第五勘察设计院集团有限公司,北京 102600
Author(s):
HE Guojun
China Railway Fifth Survey and Design Institute Group Co. ,Ltd. ,Beijing 102600 ,China
关键词:
既有线接触网高架站房过渡方案高速铁路
Keywords:
existing lineoverhead contact systemelevated station buildingtransition schemehigh-speed railway
分类号:
U225
DOI:
10.12098/j.issn.1674-8247.2023.06.016
文献标志码:
A
摘要:
随着我国高速铁路的发展,新建高速铁路引入既有车站改造也越来越多,站房改造也倾向于采用高架站房方案。安九高速铁路引入既有庐山站,站场规模为8台25线,高速铁路场与普速铁路场并站布置,站内设计大型高架站房,并需对既有雨棚进行改造。高架站房及既有雨棚情况复杂,对接触网改造设计提出了更高的要求。通过综合考虑高架站房及既有雨棚的结构形式,提出了既有车站接触网改造及过渡方案,以及适应于庐山站的接触网方案,取得了良好的效果。研究成果对今后类似工程有一定的参考意义。
Abstract:
With the development of high-speed railways in China,new high-speed railways are increasingly being connected to existing stations,necessitating the renovation of existing stations,where elevated station buildings are preferred. Anqing-Jiujiang High-speed Railway is connected to the existing Lushan Station,with a station scale of 8 platforms,25 tracks,and the high-speed railway yard arranged side by side with the conventional speed railway yard. The station is designed with large-scale elevated station buildings and existing canopies need to be renovated. The conditions of the elevated station building and existing canopies are complex,putting forward higher requirements for the renovation design of the overhead contact system. By considering the structural form of the elevated station building and the existing canopies,a specific scheme for the renovation and transition of the existing station’s overhead contact system was proposed. This scheme is suitable for Lushan Station,and has achieved excellent results. The results of this study provide certain reference significance for similar projects in the future.

参考文献/References:

[1] 王建东,古晓东,王蓓,等. 北京朝阳站接触网景观设计研究[J].铁路技术创新,2020(6):101-104. WANG Jiandong,GU Xiaodong,WANG Bei,et al. Study on Landscape Design for OCS at Beijing Chaoyang Station[J]. Railway Technical Innovation,2020(6):101-104.
[2] 梁英. 车站接触网在股道间立柱方案研究[J]. 铁道标准设计, 2014,58(5):128-131,136. LIANG Ying. Research on How to Erect Catenary’s Pillars between Two Tracks at Railway Station[J]. Railway Standard Design,2014, 58(5):128-131,136.
[3] 陈靖. 铁路客站接触网与站房景观协调性优化分析[J]. 铁道建筑技术,2012(12):103-106. CHEN Jing. Analysis on Coordination Optimization between Canopy and Station Building[J]. Railway Construction Technology,2012 (12):103-106.
[4] TB 10009 - 2016铁路电力牵引供电设计规范 [S]. TB 10009 - 2016 Code for Design of Railway Traction Power Supply [S].
[5] TB 10621 - 2014高速铁路设计规范[S]. TB 10621 - 2014 Code for Design of High Speed Railway [S].
[6] 于晨. 武夷山站电化改造雨棚接口设计[J]. 铁道标准设计, 2013,57(8):123-124,128. YU Chen. Interface Design between Electrification Renovation Project and Platform Canopy at Wuyishan Railway Station[J]. Railway Standard Design,2013,57(8):123-124,128.
[7] 谷元平. 兰州西站接触网与站房雨棚接口设计方案分析[J]. 铁路技术创新,2015(5):70-73. GU Yuanping. Analysis on the Design Scheme of the Interface between Catenary and Canopy of Lanzhou West Railway Station[J]. Railway Technical Innovation,2015(5):70-73.
[8] TB 10180 - 2016铁路防雷及接地工程技术规范 [S]. TB 10180 - 2016 Technical Code for Lightning Protection and Earthing of Railway [S].
[9] 刘君清. 铁路大型站场施工改造过渡供电方案优化[J]. 中国铁路,2019(12):91-96. LIU Junqing. Optimization of Transitional Power Supply Scheme for Large Railway Stations and Yards Reconstruction[J]. China Railway,2019(12):91-96.
[10]?贾陈君. 既有电气化铁路改造过渡设计与拨接施工[J]. 铁道建筑,2012,52(3):99-102. JIA Chenjun. Transition Design and Dial-up Construction of Existing Electrified Railway Reconstruction[J]. Railway Engineering, 2012,52(3):99-102.
[11]?施锦涛. 温福铁路苍南站改扩建方案研究[J]. 高速铁路技术, 2020,11(S1):72-75,79. SHI Jintao. Research on the Reconstruction and Expansion Scheme of Cangnan Station of Wenzhou-Fuzhou Railway[J]. High Speed Railway Technology,2020,11(S1):72-75,79.
[12]?辛子平. 既有电气化铁路站场改造中接触网设计及施工优化[J]. 中国铁路,2014(5):94-97. XIN Ziping. Design and Construction Optimization of Catenary in the Reconstruction of Existing Electrified Railway Yard[J]. Chinese Railways,2014(5):94-97.
[13]?高胤. 既有线电气化铁路接触网改造技术[J]. 工程建设与设计, 2021(21):118-120. GAO Yin. Catenary Transformation Technology of Existing Electrified Railway[J]. Construction & Design for Engineering,2021(21):118-120.
[14]?张健. 哈大高速铁路转临时便线接触网过渡设计研究[J]. 铁道标准设计,2014,58(5):124-127. ZHANG Jian. Design Research for Overhead Contact Line System’s Transition from High-speed Railway to Temporary Detour[J]. Railway Standard Design,2014,58(5):124-127.
[15]?秦国金. 既有线上新建跨线站房接触网过渡施工技术[J]. 铁道建筑技术,2013(12):105-108. QIN Guojin. Transition Construction Technologies of Overhead Contact Line on Existing Railway Elevated Building[J]. Railway Construction Technology,2013(12):105-108.

相似文献/References:

[1]杨廷宇,魏昌辛,柯小梁.黔桂铁路广西段动力集中型动车组开行方案研究[J].高速铁路技术,2023,14(05):105.[doi:10.12098/j.issn.1674-8247.2023.05.019]
 YANG Tingyu,WEI Changxin,KE Xiaoliang.A Study on Operation Scheme of Power-concentrated Multiple Units in Guangxi Section of Guizhou-Guangxi Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(06):105.[doi:10.12098/j.issn.1674-8247.2023.05.019]
[2]李军,倪俊琪.接触网基础及钢柱损伤处置技术方案研讨[J].高速铁路技术,2023,14(06):32.[doi:10.12098/j.issn.1674-8247.2023.06.006]
 LI Jun,NI Junqi.Discussion on Technical Scheme for Managing Damage to Foundation and Mast of Overhead Contact System[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(06):32.[doi:10.12098/j.issn.1674-8247.2023.06.006]
[3]杨佳,杨洋,鲁小兵,等.复杂艰险山区铁路接触网设计技术思考[J].高速铁路技术,2023,14(06):35.[doi:10.12098/j.issn.1674-8247.2023.06.007]
 YANG Jia,YANG Yang,LU Xiaobing,et al.Reflections on the Design Techniques for the Railway Overhead Contact System in Challenging Mountain Areas[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(06):35.[doi:10.12098/j.issn.1674-8247.2023.06.007]
[4]苏光德.跨海湾高速铁路接触网工程关键技术与应用[J].高速铁路技术,2024,15(02):56.[doi:10.12098/j.issn.1674-8247.2024.02.010]
 SU Guangde.Key Technologies and Applications of Overhead Contact System for Cross-bay High-speed Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2024,15(06):56.[doi:10.12098/j.issn.1674-8247.2024.02.010]

备注/Memo

备注/Memo:
收稿日期:2022-09-06
作者简介:何国军(1986-),男,高级工程师。
更新日期/Last Update: 2023-12-30