参考文献/References:
[1] 王建东,古晓东,王蓓,等. 北京朝阳站接触网景观设计研究[J].铁路技术创新,2020(6):101-104. WANG Jiandong,GU Xiaodong,WANG Bei,et al. Study on Landscape Design for OCS at Beijing Chaoyang Station[J]. Railway Technical Innovation,2020(6):101-104.
[2] 梁英. 车站接触网在股道间立柱方案研究[J]. 铁道标准设计, 2014,58(5):128-131,136. LIANG Ying. Research on How to Erect Catenary’s Pillars between Two Tracks at Railway Station[J]. Railway Standard Design,2014, 58(5):128-131,136.
[3] 陈靖. 铁路客站接触网与站房景观协调性优化分析[J]. 铁道建筑技术,2012(12):103-106. CHEN Jing. Analysis on Coordination Optimization between Canopy and Station Building[J]. Railway Construction Technology,2012 (12):103-106.
[4] TB 10009 - 2016铁路电力牵引供电设计规范 [S]. TB 10009 - 2016 Code for Design of Railway Traction Power Supply [S].
[5] TB 10621 - 2014高速铁路设计规范[S]. TB 10621 - 2014 Code for Design of High Speed Railway [S].
[6] 于晨. 武夷山站电化改造雨棚接口设计[J]. 铁道标准设计, 2013,57(8):123-124,128. YU Chen. Interface Design between Electrification Renovation Project and Platform Canopy at Wuyishan Railway Station[J]. Railway Standard Design,2013,57(8):123-124,128.
[7] 谷元平. 兰州西站接触网与站房雨棚接口设计方案分析[J]. 铁路技术创新,2015(5):70-73. GU Yuanping. Analysis on the Design Scheme of the Interface between Catenary and Canopy of Lanzhou West Railway Station[J]. Railway Technical Innovation,2015(5):70-73.
[8] TB 10180 - 2016铁路防雷及接地工程技术规范 [S]. TB 10180 - 2016 Technical Code for Lightning Protection and Earthing of Railway [S].
[9] 刘君清. 铁路大型站场施工改造过渡供电方案优化[J]. 中国铁路,2019(12):91-96. LIU Junqing. Optimization of Transitional Power Supply Scheme for Large Railway Stations and Yards Reconstruction[J]. China Railway,2019(12):91-96.
[10]?贾陈君. 既有电气化铁路改造过渡设计与拨接施工[J]. 铁道建筑,2012,52(3):99-102. JIA Chenjun. Transition Design and Dial-up Construction of Existing Electrified Railway Reconstruction[J]. Railway Engineering, 2012,52(3):99-102.
[11]?施锦涛. 温福铁路苍南站改扩建方案研究[J]. 高速铁路技术, 2020,11(S1):72-75,79. SHI Jintao. Research on the Reconstruction and Expansion Scheme of Cangnan Station of Wenzhou-Fuzhou Railway[J]. High Speed Railway Technology,2020,11(S1):72-75,79.
[12]?辛子平. 既有电气化铁路站场改造中接触网设计及施工优化[J]. 中国铁路,2014(5):94-97. XIN Ziping. Design and Construction Optimization of Catenary in the Reconstruction of Existing Electrified Railway Yard[J]. Chinese Railways,2014(5):94-97.
[13]?高胤. 既有线电气化铁路接触网改造技术[J]. 工程建设与设计, 2021(21):118-120. GAO Yin. Catenary Transformation Technology of Existing Electrified Railway[J]. Construction & Design for Engineering,2021(21):118-120.
[14]?张健. 哈大高速铁路转临时便线接触网过渡设计研究[J]. 铁道标准设计,2014,58(5):124-127. ZHANG Jian. Design Research for Overhead Contact Line System’s Transition from High-speed Railway to Temporary Detour[J]. Railway Standard Design,2014,58(5):124-127.
[15]?秦国金. 既有线上新建跨线站房接触网过渡施工技术[J]. 铁道建筑技术,2013(12):105-108. QIN Guojin. Transition Construction Technologies of Overhead Contact Line on Existing Railway Elevated Building[J]. Railway Construction Technology,2013(12):105-108.
相似文献/References:
[1]杨廷宇,魏昌辛,柯小梁.黔桂铁路广西段动力集中型动车组开行方案研究[J].高速铁路技术,2023,14(05):105.[doi:10.12098/j.issn.1674-8247.2023.05.019]
YANG Tingyu,WEI Changxin,KE Xiaoliang.A Study on Operation Scheme of Power-concentrated Multiple Units in Guangxi Section of Guizhou-Guangxi Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(06):105.[doi:10.12098/j.issn.1674-8247.2023.05.019]
[2]李军,倪俊琪.接触网基础及钢柱损伤处置技术方案研讨[J].高速铁路技术,2023,14(06):32.[doi:10.12098/j.issn.1674-8247.2023.06.006]
LI Jun,NI Junqi.Discussion on Technical Scheme for Managing Damage to Foundation and Mast of Overhead Contact System[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(06):32.[doi:10.12098/j.issn.1674-8247.2023.06.006]
[3]杨佳,杨洋,鲁小兵,等.复杂艰险山区铁路接触网设计技术思考[J].高速铁路技术,2023,14(06):35.[doi:10.12098/j.issn.1674-8247.2023.06.007]
YANG Jia,YANG Yang,LU Xiaobing,et al.Reflections on the Design Techniques for the Railway Overhead Contact System in Challenging Mountain Areas[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(06):35.[doi:10.12098/j.issn.1674-8247.2023.06.007]
[4]苏光德.跨海湾高速铁路接触网工程关键技术与应用[J].高速铁路技术,2024,15(02):56.[doi:10.12098/j.issn.1674-8247.2024.02.010]
SU Guangde.Key Technologies and Applications of Overhead Contact System for Cross-bay High-speed Railway[J].HIGH SPEED RAILWAY TECHNOLOGY,2024,15(06):56.[doi:10.12098/j.issn.1674-8247.2024.02.010]