[1]陈建国.基于实景图的铁路大、小型临时工程界面及投资划分研究[J].高速铁路技术,2023,14(03):37-42.[doi:10.12098/j.issn.1674-8247.2023.03.008]
 CHEN Jianguo.A Study on Interface and Investment Division of Large and Small Temporary Works of Railway Based on the Real Picture[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(03):37-42.[doi:10.12098/j.issn.1674-8247.2023.03.008]
点击复制

基于实景图的铁路大、小型临时工程界面及投资划分研究()
分享到:

《高速铁路技术》[ISSN:1674-8247/CN:51-1730/U]

卷:
14卷
期数:
2023年03期
页码:
37-42
栏目:
理论探索
出版日期:
2023-06-01

文章信息/Info

Title:
A Study on Interface and Investment Division of Large and Small Temporary Works of Railway Based on the Real Picture
文章编号:
1674-8247(2023)03-0037-06
作者:
陈建国
中铁二院工程集团有限责任公司,成都610031
Author(s):
CHEN Jianguo
China Railway Eryuan Engineering Group Co. ,Ltd. ,Chengdu 610031 ,China
关键词:
铁路工程大型临时工程小型临时工程实景图编制办法
Keywords:
railway engineeringlarge-scale temporary workssmall-scale temporary worksreal picturepreparation method
分类号:
F532
DOI:
10.12098/j.issn.1674-8247.2023.03.008
文献标志码:
A
摘要:
随着铁路建设技术标准的提高,铁路现场建设管理愈趋于规范,对临建工程的建设标准及验收标准提出了更高要求,如何控制临建工程数量及投资差异是铁路工程建设管理面临的新问题。本文运用现场调研、实景布局等方法,以混凝土拌合站、梁场和施工便道等重点大型临时工程及项目驻地、小临便道、小临构筑物等为研究重点,对大、小型临时工程项目与费用内容进行了总结,并从工程部位、界面划分、费用划分和依据等方面进行了研究,得到大、小临工程界面及投资划分规则。研究成果可为进一步理解新版编制办法和费用定额体系,提高临建工程建设的科学性、合理性提供技术支持。
Abstract:
With the improvement of railway construction technical standards,railway site construction management is becoming more and more standardized,demanding higher requirements for the construction standards and acceptance standards of temporary works. How to control the quantity and investment difference of temporary works is a new situation and new problem facing railway engineering construction management. This paper summarizes the items and cost contents of large and small temporary works by means of field investigation and real-scene layout,focusing on key large-scale temporary works such as concrete mixing plant,beam yard,and construction access road,as well as project camp,small temporary access road and structures,and studies the aspects of project parts,interface division,cost division,and basis,obtaining rules for interface and investment division of large and small temporary works. The research results can provide technical support for further understanding the new edition of the preparation method and cost quota system to improve the scientificity and rationality of temporary construction.

参考文献/References:

[1]国铁科法[2017]30号,铁路基本建设工程设计概(预)算编制办法[S]. GTKF[2017]No. 30,Compilation Method of Railway Capital Construction Engineering Design Budget[S].
[2]国铁科法[2017]31号,铁路基本建设工程设计概(预)算费用定额[S]. GTKF[2017]No. 31,Budget Cost Quota of Railway Capital Construction Engineering Design[S].
[3]魏永幸,刘会娟,王占盛,等. 支挡结构安全风险识别与防控研究[J]. 高速铁路技术,2022,13(1):1-6. WEI Yongxing,Liu Huijuan,Wang Zhansheng,et al. Research on Safety Risk Identification and Prevention and Control of Retaining Structure[J]. High Speed Railway Technology,2022,13(1):1-6.
[4]李准,张穷. 浮动平均值在大变形隧道定额测定与分析中的应用[J]. 高速铁路技术,2022,13(1):60-63. LI Zhun,ZHANG Qiong. Application of Floating Average Value in Quota Determination and Analysis of Large Deformation Tunnel[J]. High Speed Railway Technology,2022,13(1):60-63.
[5]魏永幸,岳志勤,李光辉. 复杂艰险山区地质灾害识别与铁路减灾选线[J]. 高速铁路技术,2019,10(3):1-5,24. WEI Yongxing,YUE Zhiqin,LI Guanghui. Identification of Geological Hazards and Disaster Reduction Techniques of Railway Route Selection in Complex Dangerous Mountain Area[J]. High Speed Railway Technology,2019,10(3):1-5,24.
[6]李准. 铁路工程造价超概算的原因与控制措施分析[J]. 建筑技术开发,2020,47(3):120-121. LI Zhun. Analysis on Causes and Control Measures of Cost Exceeding the Budget Estimate of Railway Engineering[J]. Building Technique Development,2020,47(3):120-121.
[7]李准,张路刚. 西部山区铁路隧道涌水抽排施工方案探讨[J].高速铁路技术,2018,9(4):88-92. LI Zhun,Zhang Lugang. Discussion on Construction Scheme of Pumping and Draining Water Gushing from Railway Tunnel in Western Mountainous Area[J]. High Speed Railway Technology, 2018,9(4):88-92.
[8]李准,刘昕. 高风险多因素下高原铁路施工道路模型研究[J].铁道工程学报,2021,38(8):20-24,52. LI Zhun,LIU Xin. Research on the Construction Road Model of the Plateau Railway under the Condition of High-risk and Multi-factor [J]. Journal of Railway Engineering Society,2021,38(8):20-24,52.

相似文献/References:

[1]王哲威,冯 涛,杜宇本,等.地质横断面选线技术在铁路工程中的应用[J].高速铁路技术,2022,13(06):69.[doi:10.12098/j.issn.1674-8247.2022.06.013 ]
 WANG Zhewei,FENG Tao,DU Yuben,et al.Application of Geological Cross-section Route Selection Technology in Railway Engineering[J].HIGH SPEED RAILWAY TECHNOLOGY,2022,13(03):69.[doi:10.12098/j.issn.1674-8247.2022.06.013 ]
[2]李准,丁梯,罗福君.长工期铁路工程间接费费率优化策略研究[J].高速铁路技术,2023,14(04):19.[doi:10.12098/j.issn.1674-8247.2023.04.004]
 LI Zhun,DING Ti,LUO Fujun.A Study on Optimization Strategy of Indirect Cost Rate for Railway Projects with a Long Construction Period[J].HIGH SPEED RAILWAY TECHNOLOGY,2023,14(03):19.[doi:10.12098/j.issn.1674-8247.2023.04.004]
[3]刘伟,周超,金俊俊.不同地质雷达设备在铁路工程隐伏岩溶探测中的应用与对比[J].高速铁路技术,2024,15(04):82.[doi:10.12098/j.issn.1674-8247.2024.04.015]
 LIU Wei,ZHOU Chao,JIN Junjun.Application and Comparison of Different Ground Penetrating Radar Systems in the Detection of Concealed Karst in Railway Engineering[J].HIGH SPEED RAILWAY TECHNOLOGY,2024,15(03):82.[doi:10.12098/j.issn.1674-8247.2024.04.015]

备注/Memo

备注/Memo:
收稿日期:2022-06-08
作者简介:陈建国(1977-),男,高级工程师。
更新日期/Last Update: 2023-06-01